Market Snapshot
  • U.S.
  • Europe
  • Asia
Ticker Volume Price Price Delta
DJIA 15,112.20 -206.04 -1.35%
S&P 500 1,628.93 -22.88 -1.39%
Nasdaq 3,443.20 -38.98 -1.12%
Ticker Volume Price Price Delta
STOXX 50 2,627.69 -56.29 -2.10%
FTSE 100 6,225.10 -123.72 -1.95%
DAX 8,021.90 -175.18 -2.14%
Ticker Volume Price Price Delta
Nikkei 13,014.60 -230.64 -1.74%
Hang Seng 20,382.90 -604.02 -2.88%
S&P/ASX 200 4,758.39 -102.99 -2.12%

GDF Suez to Complete Romanian Wind Farm by Early December

GDF Suez SA (GSZ) will complete the construction of a 75 million-euro ($96 million) wind farm in Romania at the end of November or early December, said Eric Stab, who heads GDF Suez Energy Romania.

The French natural-gas distributor will conclude building its 48-megawatt wind farm and is considering investing into other wind projects in the eastern European country, Stab said today in an interview in Bucharest.

“This investment is on track,” Stab said. “We do have different wind projects at different stages of maturity and I hope we can move ahead with other projects in the not-too- distant future.”

Romania is attracting energy investors, including CEZ AS (CEZ) and Enel Green Power SpA (EGPW), with its wind investment-incentive program and the location in the southern Black Sea region of Dobrogea, where the average wind speed is about 25.2 kilometers per hour (15.7 miles per hour).

To contact the reporter on this story: Irina Savu in Bucharest at isavu@bloomberg.net.

To contact the editor responsible for this story: James M. Gomez at jagomez@bloomberg.net

Bloomberg moderates all comments. Comments that are abusive or off-topic will not be posted to the site. Excessively long comments may be moderated as well. Bloomberg cannot facilitate requests to remove comments or explain individual moderation decisions.

Sponsored Link