Last €43.22 EUR
Change Today +1.37 / 3.27%
Volume 5.7K
KC4 On Other Exchanges
Symbol
Exchange
Helsinki
OTC US
OTC US
Frankfurt
As of 11:47 AM 01/26/15 All times are local (Market data is delayed by at least 15 minutes).

kone oyj-b (KC4) Snapshot

Open
€41.70
Previous Close
€41.85
Day High
€43.22
Day Low
€41.42
52 Week High
01/26/15 - €43.22
52 Week Low
03/14/14 - €27.40
Market Cap
22.7B
Average Volume 10 Days
1.3K
EPS TTM
--
Shares Outstanding
448.2M
EX-Date
02/25/14
P/E TM
--
Dividend
€1.00
Dividend Yield
2.31%
Current Stock Chart for KONE OYJ-B (KC4)

Related News

No related news articles were found.

kone oyj-b (KC4) Details

KONE Oyj, together with its subsidiaries, operates in the elevator and escalator industry. It offers elevators, escalators, autowalks, automatic doors, and monitoring and access control systems for residential and office buildings, public transportation and airports, hotels, retail centers, cruise ships, stadiums, concert halls, and medical facilities. The company also provides design services, such as project planning and specification, and traffic analysis; construction services comprising project management and installation; maintenance and monitoring solutions; and modernization services, including upgrades and replacements. It serves architects, consultants, developers, general contractors, building owners, and facility managers in Europe, the Middle East, Africa, the Americas, and Asia/Oceania. KONE Oyj was founded in 1910 and is headquartered in Helsinki, Finland.

46,221 Employees
Last Reported Date: 10/21/14
Founded in 1910

kone oyj-b (KC4) Top Compensated Officers

No compensation data is available at this time for the top officers at this company.

Executives, Board Directors

kone oyj-b (KC4) Key Developments

KONE Wins a Fourth Consecutive Oasis-Class Cruise Ship Order

KONE will equip Royal Caribbean Cruise Line's latest luxury cruise ship, Oasis 4. The new ship will be a sister vessel of the world's large cruise vessel Oasis 3, with 42 elevators and two escalators. This is the fourth consecutive Oasis-class order for KONE. The cruise ship will feature KONE's energy-efficient people flow solutions which will benefit altogether 7,700 passengers and crew members on a daily basis. KONE is to supply the 360m long and 220,000 Gross Registered Tons (GRT) cruise ship with 24 energy-efficient KONE MiniSpace(TM) passenger elevators, including 12 scenic glass cabins, four KONE MiniSpace(TM) service elevators and 14 KONE MonoSpace(R) service elevators. All the elevators will include regenerative drives that supply energy back to the ship's power network. Oasis 4 will also be equipped with a special gangway button option which will direct passengers automatically to the correct level for disembarkation, depending on the port. The order also calls for KONE to supply two KONE TravelMaster(R) galley escalators and three KONE Motala MC 2000 platforms for people with limited mobility. Oasis 4 will be built byt STX France in St. Nazaire, France and it is expected to be ready in 2018.

KONE Wins Order from Changhsa Kineer International Center

KONE has won an order to supply 51 elevators to the three office buildings of the Changhsa Kineer International Center in Changsha, Hunan province, China. Covering an area of over 3.5 hectares and reaching the height of 220m, the buildings are expected to handle approximately 6,000 daily visitors upon completion in 2017. To guarantee high-level service, reliability and efficiency of the elevators, the Changsha Kineer International towers will feature KONE E-Link monitoring system which will monitor the performance of the elevators and the building traffic. The E-Link system uses the building's standard Local Area Network (LAN), and the connected elevators can be monitored and managed using graphical software running on a standard PC. KONE E-Link traffic displays and provides an accurate view of the transportation status, demand, traffic performance, and availability of the elevators in the building.

KONE Wins Order for Fifth + Columbia in Seattle

KONE has won an order to provide 19 elevators at Fifth + Columbia, a 44-story office building to be constructed in Seattle's central business district. The building is scheduled to open in 2017. KONE solutions will include six KONE MonoSpace machine room-less elevators and 13 KONE MiniSpace elevators, traveling at speeds of up to 6 m/s. The office elevator groups will also utilize KONE Polaris Destination Control Systems, including touch screen destination operating panels. The contract was awarded by JTM Construction, the project's general contractor. The project developer and owners are Daniels Real Estate & Stockbridge Capital Group. The new building will be located in the heart of the Seattle central business district at 801 Fifth Avenue. In addition to more than 500,000 square feet of office space, a 184 room four-star hotel and spa will be located in the new tower. The new building's innovative geometric form and natural light glass facade were designed by Zimmer Gunsul Frasca Architects of Seattle. The hotel and restaurant spaces will be designed by world renowned designer Philippe Starck. Fine dining will be available at 'The Bazaar' by internationally acclaimed Chef Jose Andres. The order was booked in the fourth quarter of 2014.

 

Stock Quotes

Market data is delayed at least 15 minutes.

Company Lookup
Recently Viewed
KC4:GR €43.22 EUR +1.37

KC4 Competitors

Market data is delayed at least 15 minutes.

Company Last Change
No competitor information is available for KC4.
View Industry Companies
 

Industry Analysis

KC4

Industry Average

Valuation KC4 Industry Range
Price/Earnings 26.2x
Price/Sales 2.6x
Price/Book 10.7x
Price/Cash Flow 20.5x
TEV/Sales 2.1x
 | 

Sponsored Financial Commentaries

Sponsored Links

Report Data Issue

To contact KONE OYJ-B, please visit www.kone.com. Company data is provided by Capital IQ. Please use this form to report any data issues.

Please enter your information in the following field(s):
Update Needed*

All data changes require verification from public sources. Please include the correct value or values and a source where we can verify.

Your requested update has been submitted

Our data partners will research the update request and update the information on this page if necessary. Research and follow-up could take several weeks. If you have questions, you can contact them at bwwebmaster@businessweek.com.