Bloomberg Anywhere Remote Login Bloomberg Terminal Demo Request


Connecting decision makers to a dynamic network of information, people and ideas, Bloomberg quickly and accurately delivers business and financial information, news and insight around the world.


Financial Products

Enterprise Products


Customer Support

  • Americas

    +1 212 318 2000

  • Europe, Middle East, & Africa

    +44 20 7330 7500

  • Asia Pacific

    +65 6212 1000


Industry Products

Media Services

Follow Us

Last €8.35 EUR
Change Today +0.07 / 0.85%
Volume 3.9K
ENO On Other Exchanges
As of 11:38 AM 10/7/15 All times are local (Market data is delayed by at least 15 minutes).

elecnor sa (ENO) Snapshot

Previous Close
Day High
Day Low
52 Week High
06/4/15 - €10.19
52 Week Low
09/29/15 - €7.74
Market Cap
Average Volume 10 Days
Shares Outstanding
Dividend Yield
Current Stock Chart for ELECNOR  SA (ENO)

Related News

No related news articles were found.

elecnor sa (ENO) Related Businessweek News

No Related Businessweek News Found

elecnor sa (ENO) Details

Elecnor, S.A. engages in infrastructure, renewable energy, and concessions and investment businesses in Spain and internationally. The company distributes electricity; operates power transport lines and transformation substations; generates power from wind, solar PV and solar thermal, combined cycle power, cogeneration, hydroelectric power, and nuclear and thermal power plants; and transports and distributes gas and related services. It also designs, develops, operates, and maintains telecommunications infrastructure, systems, and services; carries out electrification, signaling, interlock, communications, and control system turnkey projects for railways, metros, trams, and trolley buses; and offers technical, commercial, and ancillary services in the fields of electricity, communications, gas, water, and installations. In addition, the company is involved in civil works, construction, and hydraulic works activities, as well as hydrological planning; operating water transport and distribution networks, and hydraulic electromechanical facilities; provision of automation and control systems; treatment and reuse of waste and sewerage; and water purification activities. Further, it operates as a full-service installations contractor for landmark buildings, cultural and recreational centers, airport and railway terminals, hotels and hospitals, industrial plants, and cogeneration and trigeneration plants; and design, engineers, and develops solutions and systems integration in the aerospace, information systems, and telecommunications network sectors. Additionally, the company operates as a turnkey developer and contractor for wind power, photovoltaic and thermoelectric solar power, and hydroelectric power plants; builds and operates infrastructures for environment and electric power transmission systems; and manufactures products derived from cement and fiberglass-reinforced polyester. Elecnor, S.A. was founded in 1958 and is based in Madrid, Spain. Elecnor SA operates as a subsidiary of Cantiles XXI, S.L.

Founded in 1958

elecnor sa (ENO) Top Compensated Officers

No compensation data is available at this time for the top officers at this company.

Executives, Board Directors

elecnor sa (ENO) Key Developments

Elecnor SA, UrtheCast Corp. - M&A Call

To carry out the Acquisition, UrtheCast's wholly-owned subsidiary, UrtheCast International Corp., has entered into a share purchase agreement with Elecnor and Deimos Space, S.L.U. to acquire the outstanding shares of Deimos Imaging, S.L.U. and DOT Imaging, S.L.U

Elecnor Wins Construction Contract for 185-MW Wind Farm in Chile

Elecnor SA has won a contract worth USD 81 million for the construction of a 184.8-MW wind farm for Latin American Power in Chile. Elecnor will be responsible for the balance of plant (BOP), as well as engineering, supply and construction of transmission facilities, including 84 km (52 miles) of 220-kV lines, the San Juan substation and the grid connection. The San Juan wind project comprises 56 turbines of 3.3 MW each, to be installed in the Atacama region, in the coastal area south of Freirina town.

Elecnor SA, Annual General Meeting, May 19, 2015

Elecnor SA, Annual General Meeting, May 19, 2015. Location: the Westin Palace Hotel, located in the Plaza de las Cortes number 7.


Stock Quotes

Market data is delayed at least 15 minutes.

Company Lookup
Recently Viewed
ENO:SM €8.35 EUR +0.07

ENO Competitors

Market data is delayed at least 15 minutes.

Company Last Change
Abengoa SA €1.32 EUR -0.026
Acciona SA €70.71 EUR +1.24
ACS Actividades de Construccion y Servicios SA €28.50 EUR +0.62
Duro Felguera SA €2.53 EUR +0.17
TransCanada Corp C$46.09 CAD +1.14
View Industry Companies

Industry Analysis


Industry Average

Valuation ENO Industry Range
Price/Earnings 11.4x
Price/Sales 0.4x
Price/Book 1.4x
Price/Cash Flow 5.1x
TEV/Sales NM Not Meaningful

Sponsored Financial Commentaries

Sponsored Links

Report Data Issue

To contact ELECNOR SA, please visit Company data is provided by Capital IQ. Please use this form to report any data issues.

Please enter your information in the following field(s):
Update Needed*

All data changes require verification from public sources. Please include the correct value or values and a source where we can verify.

Your requested update has been submitted

Our data partners will research the update request and update the information on this page if necessary. Research and follow-up could take several weeks. If you have questions, you can contact them at