May 26, 2017 8:00 PM ET

Construction and Engineering

Company Overview of Bachy Soletanche Limited

Company Overview

Bachy Soletanche Limited provides geotechnical solutions. It offers geotechnics and foundation engineering, including LDA piling, CFA piling, restricted access mini-piling, diaphragm walls, tunnelling, grouting, and engineering. The company offers piling services, including rotary bored piling, CFA piling, rotary displacement piling, and restricted access mini piling; retaining walls services, such as bored pile, diaphragm, secant, and contiguous walls, as well as cased secant piling; anchors services that include ground anchors and soil nailing; grouting services, including jet and injection grouting; and environmental engineering, design, and civil engineering projects services. Its techni...

Henderson House

Langley Place

Higgins Lane

Burscough,  L40 8JS

United Kingdom

Founded in 1963

Phone:

44 17 0489 5686

Fax:

44 17 0489 5581

Key Executives for Bachy Soletanche Limited

Bachy Soletanche Limited does not have any Key Executives recorded.

Bachy Soletanche Limited Key Developments

VINCI Construction Grands Projets and Bachy Soletanche Ltd Win Contract for East Works Package of Thames Tideway Tunnel in London

VINCI Construction Grands Projets and Bachy Soletanche Ltd. have signed the contract for the East works package of the Thames Tideway Tunnel. The contract is worth EUR 858 million. The works package includes the construction of two sections of tunnel, a main tunnel (5.5 km) and a connecting tunnel (4.6 km) for combined rainwater and wastewater to the east of London. Located between 45 and 65 metres below ground, the two tunnels will be excavated using slurry pressure balance tunnel boring machines. The main tunnel will have an interior diameter of 7.20 metres, while that of the connecting tunnel will be 5 metres. The East section also includes the construction of five large shafts (diameters of between 17 and 25 metres), maritime works on the Thames, structures connecting with the existing wastewater collection system and electromechanical works packages. A project optimisation phase (design, methods, etc.) is starting immediately. The launch of works on the site is planned for 2016, with delivery scheduled for 2023. The East works package is one of three making up the Thames Tideway Tunnel, a programme that calls for the construction of a total of 25 km of tunnels.

Similar Private Companies By Industry

Company Name Region
101 Security Systems LTD Europe
1st Saxon Property Services Ltd. Europe
21st Century Energy Solutions Ltd Europe
40Seven Ltd. Europe
4Delivery Limited Europe

Recent Private Companies Transactions

Type
Date
Target
No transactions available in the past 12 months.
 

The information and data displayed in this profile are created and managed by S&P Global Market Intelligence, a division of S&P Global. Bloomberg.com does not create or control the content. For inquiries, please contact S&P Global Market Intelligence directly by clicking here.

Stock Quotes

Market data is delayed at least 15 minutes.

Company Lookup

Most Searched Private Companies

Company Name Geographic Region
Lawyers Committee for Civil Rights Under Law United States
NYC2012, Inc. United States
Bertelsmann AG Europe
Rush University United States
The Advertising Council, Inc. United States

Sponsored Financial Commentaries

Sponsored Links

Request Profile Update

Only a company representative may request an update for the company profile. Documentation will be required.

To contact Bachy Soletanche Limited, please visit www.bacsol.co.uk. Company data is provided by S&P Global Market Intelligence. Please use this form to report any data issues.

Please enter your information in the following field(s):
Update Needed*

All data changes require verification from public sources. Please include the correct value or values and a source where we can verify.

Your requested update has been submitted

Our data partners will research the update request and update the information on this page if necessary. Research and follow-up could take several weeks. If you have questions, you can contact them at bwwebmaster@businessweek.com.