Fluor to Build 125-Megawatt Solar Plant in Arizona for LS Power

Jan. 31 (Bloomberg) -- Fluor Corp., the U.S.’s largest publicly traded engineering and construction company, will build a 125-megawatt solar plant in Maricopa County, Arizona.

LS Power Group awarded Fluor a lump-sum contract to build the plant, the Irving, Texas-based construction company said today in a statement that didn’t give a price. Fluor included the deal in its fourth-quarter backlog.

Link to Statement:{NSN LYNYI03V2800 <GO>}

Link to Company News:{FLR US <Equity> CN <GO>} Link to Company News:{795150Z US <Equity> CN <GO>}

To contact the reporter on this story: Justin Doom in New York at jdoom1@bloomberg.net

To contact the editor responsible for this story: Will Wade at wwade4@bloomberg.net