Williams Says Transco New Jersey Work Won’t Curb Deliveries

Maintenance on the Transco natural-gas pipeline in northern New Jersey won’t interrupt customer deliveries, Christopher Stockton, a Houston-based spokesman for Williams Cos. (WMB), said in an e-mail.

“The work is related to a planned pipeline integrity test we are performing called a hydrostatic test, which involves filling the line with water to ensure it has no integrity issues,” Stockton said. “Gas is routed around the maintenance area to ensure deliveries remain whole.”

The pipeline operator was venting gas within the East Rutherford metering and regulating station today to prepare for the work, Deann Muzikar, a spokeswoman for Public Service Enterprise Group Inc. (E), operator of New Jersey’s largest utility, said in an e-mail. Transco also notified PSEG of venting in Livingston, which was producing an odor, Muzikar said.

This controlled release, a standard operating procedure, began about 7 a.m. local time and ended today, Stockton said.

The Transco system can transport 9.7 billion cubic feet a day of gas across 10,200 miles (16,400 kilometers) from the Gulf Coast to the Northeast.

To contact the reporter on this story: Naureen S. Malik in New York at nmalik28@bloomberg.net

To contact the editor responsible for this story: Dan Stets at dstets@bloomberg.net

Bloomberg reserves the right to remove comments but is under no obligation to do so, or to explain individual moderation decisions.

Please enable JavaScript to view the comments powered by Disqus.