Sweden’s Grid Puts Renewable Energy Targets at Risk, Group Says

Sweden’s power grid operator isn’t making enough provision for the growth in electricity from wind turbines, putting the nation’s renewable energy goals at risk, the Swedish Wind Energy Association said.

The capacity outlined in October by system operator Svenska Kraftnaet AB’s in a plan through 2025 is too low, the lobby group said today in a statement.

Svenska Kraftnaet will be able to handle 17 to 20 terawatt- hours of wind power annually, according to the plan. That’s short of the government target of accommodating 30 terawatt- hours as early as 2020.

“We share the association’s view that long lead times for boosting transmission grids is a problem, something which is unfortunately out of our hands,” Viktor Wallstroem, spokesman for the grid company, said today by phone from Stockholm.

Sweden is required by the European Union to raise the proportion of renewable energy production in gross final energy consumption to 49 percent by 2020 from 39.8 percent in 2005.

To contact the reporter on this story: Torsten Fagerholm in Helsinki at tfagerholm@bloomberg.net

To contact the editor responsible for this story: Lars Paulsson at lpaulsson@bloomberg.net

Press spacebar to pause and continue. Press esc to stop.

Bloomberg reserves the right to remove comments but is under no obligation to do so, or to explain individual moderation decisions.

Please enable JavaScript to view the comments powered by Disqus.