ConocoPhillips Resumes Production at Grissik, South Sumatera

ConocoPhillips (COP)’ Indonesian unit resumed natural gas output from two fields in its Corridor block in Grissik, South Sumatra province, after being shut for pipeline maintenance since April 15, the country’s oil and gas regulator said.

Production during maintenance dropped by about 200 million cubic feet per day, Gde Pradnyana, a spokesman at BPMigas, said today in a mobile-phone text message. Total production from the Grissik site is normally about 1 billion cubic feet a day, he said.

To contact the reporter on this story: Bambang Djanuarto in Jakarta at bdjanuarto@bloomberg.net

To contact the editor responsible for this story: Greg Ahlstrand at gahlstrand@bloomberg.net

Press spacebar to pause and continue. Press esc to stop.

Bloomberg reserves the right to remove comments but is under no obligation to do so, or to explain individual moderation decisions.

Please enable JavaScript to view the comments powered by Disqus.