Cadillac Ventures Inc.: Update on Burnt Hill Property

Cadillac Ventures Inc.: Update on Burnt Hill Property 
TORONTO, ONTARIO -- (Marketwire) -- 03/14/13 -- Cadillac Ventures
Inc. (TSX VENTURE:CDC) ("Cadillac" or the "Company") is pleased to
provide the following update regarding the Burnt Hill Property,
located in central New Brunswick. 
Burnt Hill Update 
In 2011 Cadillac mounted two small drill programs at Burnt Hill
designed to test the lateral extent of mineralized zones identified
in drill holes from 1976, 1979 and 2007, and to fill in data gaps
within the resource calculated for Burnt Hill in 2009 based upon the
1976, 1979 and 2007 drilling. Cadillac is releasing these results in
a consolidated press release today in order to provide information
regarding the status of Burnt Hill. The fall/winter 2012 exploration
prospecting and drilling campaigns were successful and will be press
released following this orientation release. 
"Cadillac has recently focused our exploration resources on Burnt
Hill, and we are pleased with our success to date. We also feel that
a great deal of potential value lies in proving a significant
tungsten, tin resource in Atlantic Canada, in a jurisdiction noted
for being the world's most attractive jurisdiction for mineral
exploration and development in 2012," stated Norman Brewster,
President and CEO of Cadillac. 
Burnt Hill Resource Estimate 
Burnt Hill has a resource estimate in place on the property as
follows: 


 
                                                                            
                     -------------------------------------------------------
                     -------------------------------------------------------
                              INDICATED                    INFERRED         
                     -------------------------------------------------------
             Cut-Off           WO3   MoS2   SnO2           WO3   MoS2   SnO2
             WO3      TONNES   (%)    (%)    (%)  TONNES   (%)    (%)    (%)
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Open Pit     0.10%   245,000 0.530  0.012  0.012  38,000 0.413  0.008  0.008
----------------------------------------------------------------------------
Underground  0.25%   216,000 0.440  0.011  0.007 552,000 0.543  0.009  0.013
----------------------------------------------------------------------------
Total                461,000 0.489  0.012  0.010 590,000 0.535  0.009  0.013
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                                                            
Note: The above resource estimate is reproduced from the "Technical Report  
and Resource Estimate on the Burnt Hill Deposit, York County, New Brunswick,
Canada" dated September 9, 2009, a copy of which can be found under the     
Company's profile on Sedar.                                                 

 
Cadillac considers this to be a preliminary resource, calculated
using the historic drilling, limited drilling in 2007, and a
resampling for verification purposes of the historic core. Subsequent
to this 2009 resource calculation, Cadillac was focused on the
acquisition of and exploration of the Company's Thierry Project. 
Consequently, operations at Burnt Hill were limited but sufficient to
keep the property in good standing. 
Upon the calculation of this resource a future exploration plan was
also developed, aimed at further defining the deposit and moving the
categorization of the resource from inferred to indicated by drilling
in areas of the deposit where the Company's consultants and authors
of the above referenced technical report, P&E Mining Consultants
Inc., recommended further drilling. In 2011 and again in 2012,
Cadillac drilled a number of these holes, In 2012 exploration
drilling was also added. 
Burnt Hill 2011 Drill Campaign 
In 2011 a total of 2330.08m were drilled over a total of 10 drill
holes, 1836 samples were taken which included 114 standards, 114
blanks, 114 double splits and 58 coarse rejects. Each of the
completed holes successfully intersected mineralization above the
cut-off grades used in the resource calculation, with the exception
of hole BH-11-07 which intersected an unknown shaft at 11m and was
abandoned. Samples selected were assayed for tungsten, tin and
molybdenum. 
To view the "Burnt Hill Collar Location Plan", please visit the
following link:
http://media3.marketwire.com/docs/CDCFigure_859828.pdf. 


 
                                                                            
Drill Hole Highlights                                                       
                                                                            
----------------------------------------------------------------------------
                 From         To     Length                                 
Hole #            (m)        (m)        (m)         W%        Sn%        Mo%
BH-11-01        40.83      41.35       0.52       2.81                      
BH-11-01       101.12      101.9       0.78                  0.19           
BH-11-01          146        147          1                  0.31           
BH-11-01          176      179.6        3.6       0.19                      
BH-11-01       235.87     236.67        0.8       0.16       0.97       0.14
----------------------------------------------------------------------------
BH-11-02           15         16          1       0.15                      
BH-11-02           20         23          3       0.11                      
BH-11-02           33         34          1       0.15                      
BH-11-02           36         37          1       0.11                      
BH-11-02           42         43          1       0.14                      
BH-11-02           42         45          3       0.18                      
BH-11-02           71      71.84       0.84       0.32                      
BH-11-02          126        127          1       0.10                      
BH-11-02          148        150          2       0.35                      
----------------------------------------------------------------------------
BH-11-03           61         62          1                  0.13       0.13
BH-11-03           62         63          1       0.49                      
BH-11-03           85         86          1       0.16                      
BH-11-03           92         93          1       0.11                      
BH-11-03        105.9        107        1.1       0.44       1.87       0.17
----------------------------------------------------------------------------
BH-11-04A           8          9          1                  0.18           
BH-11-04A          14         15          1       0.45                      
BH-11-04A          15         16          1       0.11       0.34           
BH-11-04A          20         22          2       0.54                      
BH-11-04A          48         49          1       0.37                      
BH-11-04B           4          5          1       0.27                      
BH-11-04B           9         12          3       0.26                      
BH-11-04B          17         18          1       0.52                      
BH-11-04B          21         22          1       0.73                      
BH-11-04B          27         28          1       0.99       0.07           
BH-11-04B          48         49          1       0.22                      
----------------------------------------------------------------------------
BH-11-05           15         16          1       0.26                      
BH-11-05           30         31          1       0.13                      
BH-11-05           41         42          1       0.11                      
BH-11-05           50         53          3       0.25                      
BH-11-05           61         62          1       0.82                      
BH-11-05           70         71          1                  0.23           
BH-11-05           95         96          1       0.28                      
BH-11-05          102        104          2       0.39                      
BH-11-05          106        107          1       0.17                      
BH-11-05          116        117          1       0.14                      
BH-11-05          139        140          1       0.22       0.07           
----------------------------------------------------------------------------
BH-11-06        74.00      75.00          1      0.166       0.35           
BH-11-06        98.00      99.00          1       0.37                      
BH-11-06       140.00     141.00          1      0.123                      
BH-11-06       184.00     185.00          1       1.63                      
BH-11-06       230.00     231.00          1                 0.122           
BH-11-06       235.00     236.00          1                 0.103           
BH-11-06       245.00     246.00          1                 0.132           
----------------------------------------------------------------------------
BH-11-08        56.00      57.00          1      0.148                      
BH-11-08        65.00      66.00          1      0.899                      
BH-11-08        67.00      68.00          1      0.133                      
BH-11-08        69.00      70.00          1      0.764                      
BH-11-08       106.00     107.00          1      0.118                      
BH-11-08       132.00     133.56       1.56                 0.103           
BH-11-08       143.00     144.00          1                 0.358           
BH-11-08       147.00     148.00          1                 0.144           
BH-11-08       152.00     153.00          1      0.134                      
BH-11-08       168.00     169.00          1      0.207                      
BH-11-08       184.00     185.00          1      0.178                      
BH-11-08       193.00     194.00          1                 0.267           
BH-11-08       199.00     200.00          1                 0.118           
BH-11-08       216.00     217.00          1                 0.137           
BH-11-08       224.00     225.00          1       0.12                      
BH-11-08       233.00     234.00          1       0.13                      
BH-11-08       235.00     236.00          1       0.14                      
BH-11-08       279.00     280.00          1                   0.1           
BH-11-08       281.00     282.00          1       0.23                      
BH-11-08       284.00     285.00          1       0.14                      
BH-11-08       288.00     289.53       1.53       0.19                      
BH-11-08       289.53     291.00       1.47       0.10                      
----------------------------------------------------------------------------
BH-11-09        47.00      48.00          1      0.369                      
BH-11-09       101.00     102.00          1                 0.147     0.0535
BH-11-09       172.00     173.00          1                 0.388           
BH-11-09       178.00     179.28       1.28                0.0696           
----------------------------------------------------------------------------
BH-11-10        26.00      27.00          1                0.0479           
BH-11-10        28.00      29.66       1.66      0.346                      
BH-11-10        43.00      44.00          1      0.183                      
BH-11-10        56.00      57.00          1      0.107                      
BH-11-10       195.00     196.00          1       0.15                0.0121
BH-11-10       216.00     218.00          2      0.516                0.0729
BH-11-10       251.00     252.00          1       0.28                      
----------------------------------------------------------------------------

 
Assay results detailed above represent notable values of specific
elements above a cut-off grade of 0.1% W, 0.02% M and 0.03% Sn, lack
of a result in a field does not mean no assay value was received, it
simply isn't highlighted. Samples were selected in the field from
drillcore, the drillcore was sawn in half, with one half bagged,
tagged and security sealed in the field under the supervision of a
qualified person. The sealed samples were delivered by hand to
Activation Laboratories in Fredericton, an ISO Accredited facility,
where they were prepped and assayed. 
Brian H. Newton of Billiken Management Services Inc. supervised the
exploration program and the assaying, and reviewed and approved the
technical disclosure in this press release. 
About Cadillac 
Cadillac is a development-focused copper company currently advancing
its 100% owned Thierry Property, near Pickle Lake, Ontario. The
Thierry Property consists of the past producing Thierry Mine and
hosts two NI 43-101 compliant resources: Thierry Mine and K1-1. 
In addition, Cadillac also holds a 51% interest (with a right to
increase to a 65% interest) in the Burnt Hill Project, a historic
tungsten/tin mine taken to test production by Mr. Norman Brewster
P.Geo for Canadian International Paper during the early 1980's.
Cadillac looks forward to resuming the development of this project. 
For more information regarding Cadillac, please visit the Company's
website at www.cadillacventures.com.  
Neither TSX Venture Exchange nor its Regulation Services Provider (as
that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this release. 
Contacts:
Cadillac Ventures Inc.
Norman Brewster
President and Chief Executive Officer
416 203-7722
www.cadillacventures.com
 
 
Press spacebar to pause and continue. Press esc to stop.