African Gold Group, Inc. Northern Step Out Hole Intercepts 75 Meters of 1.92 g/t Au & 68 Meters of 0.96 g/t Au-Ends in

African Gold Group, Inc. Northern Step Out Hole Intercepts 75 Meters of 1.92 
g/t Au & 68 Meters of 0.96 g/t Au-Ends in
Mineralization-Kobada, Mali 
TORONTO, ONTARIO -- (Marketwire) -- 02/27/13 -- African Gold Group,
Inc., (TSX VENTURE:AGG) ("AGG" or the "Company") is pleased to report
the analytical results for 20 near surface (oxide), reverse
circulation (RC) step out drill holes, from the Company's Kobada,
Mali gold project.  
Near Surface (Oxide) Drill Highlights From Northern Step Out RC Holes
Include: 


 
KBRC12-010: 52 m @ 1.28 g/t Au, ended in mineralization                     
KBRC12-012: 41 m @ 1.04 g/t Au, ended in mineralization                     
KBRC12-013: 85 m @ 1.13 g/t Au                                              
KBRC12-014: 107 m @ 1.21 g/t Au, ended in mineralization                    
KBRC12-015: 43 m @ 1.39 g/t Au, ended in mineralization                     
KBRC12-016: 75 m @ 1.92 g/t Au & 68 m @ 0.96 g/t Au, ended in mineralization
KBRC12-017: 109 m @ 0.81 g/t Au                                             
KBRC12-018: 56 m @ 1.21 g/t Au, ended in mineralization                     
KBRC12-020: 146 m @ 1.13 g/t Au, ended in mineralization                    

 
The assay results detailing mineralized intercepts for the 20 near
surface (oxide) northern step out RC holes are listed in Table 1
below: 


 
TABLE 1                                                                     
                                                                            
----------------------------------------------------------------------------
Section    Hole ID    From     To  Length     Au EOH Degrees  Hole Objective
                       (m)    (m)     (m)  (g/t) (m)    (tn)                
----------------------------------------------------------------------------
850S    KBRC12-009   15.00  39.00   24.00   1.20               Infill Zone 1
                                                                       North
                                                                   extension
850S     including   20.00  21.00    1.00  10.51                            
850S    KBRC12-009   48.00  66.00   18.00   1.02                            
850S    KBRC12-009  104.00 153.00   49.00   0.51                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
850S    KBRC12-010    2.00  19.00   17.00   0.58 147     200   Infill Zone 1
                                                                       North
                                                                   extension
850S    KBRC12-010   28.00  48.00   20.00   0.68                            
850S    KBRC12-010   95.00 147.00   52.00   1.28                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
850S    KBRC12-011    0.00   5.00    5.00   0.51 128     200   Infill Zone 1
                                                                       North
                                                                   extension
850S    KBRC12-011   15.00  18.00    3.00   0.32                            
850S    KBRC12-011   28.00  39.00   11.00   0.57                            
850S    KBRC12-011   49.00  52.00    3.00   0.75                            
850S    KBRC12-011   86.00  89.00    3.00   0.30                            
850S    KBRC12-011   97.00 108.00   11.00   0.36                            
850S    KBRC12-011  115.00 121.00    6.00   0.51                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
800S    KBRC12-012    2.00   5.00    3.00   0.62 153     200   Infill Zone 1
                                                                       North
                                                                   extension
800S    KBRC12-012   59.00  63.00    4.00   2.51                            
800S    KBRC12-012   97.00 101.00    4.00   0.38                            
800S    KBRC12-012  110.00 151.00   41.00   1.04                            
800S     Including  130.00 131.00    1.00  10.56                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
800S    KBRC12-013    2.00  21.00   19.00   0.68 135     200   Infill Zone 1
                                                                       North
                                                                   extension
800S    KBRC12-013   30.00  33.00    3.00   0.30                            
800S    KBRC12-013   45.00 130.00   85.00   1.13                            
800S     Including   55.00  56.00    1.00  10.15                            
800S     Including   81.00  82.00    1.00  18.11                            
----------------------------------------------------------------------------
800S    KBRC12-014    2.00  18.00   16.00   0.32 153     200   Infill Zone 1
                                                                       North
                                                                   extension
800S    KBRC12-014   27.00  37.00   10.00   0.30                            
800S    KBRC12-014   46.00 153.00  107.00   1.21                            
800S     Including   58.00  59.00    1.00  56.10                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
800S    KBRC12-015   15.00  58.00   43.00   1.39 141     200   Infill Zone 1
                                                                       North
                                                                   extension
800S     Including   16.00  17.00    1.00  10.60                            
800S     Including   19.00  20.00    1.00  11.73                            
800S    KBRC12-015   81.00  84.00    3.00   0.43                            
800S    KBRC12-015   99.00 102.00    3.00   0.62                            
800S    KBRC12-015  126.00 141.00   15.00   2.15                            
800S     Including  134.00 135.00    1.00  22.93                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
750S    KBRC12-016    1.00  76.00   75.00   1.92 153     200   Infill Zone 1
                                                                       North
                                                                   extension
750S     Including   15.00  16.00    1.00  22.12                            
750S     Including   27.00  28.00    1.00  17.60                            
750S     Including   54.00  55.00    1.00  12.94                            
750S    KBRC12-016   85.00 153.00   68.00   0.96                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
750S    KBRC12-017    2.00 111.00  109.00   0.81 123     200   Infill Zone 1
                                                                       North
                                                                   extension
750S     Including   31.00  32.00    1.00  10.99                            
----------------------------------------------------------------------------
750S    KBRC12-018   11.00  67.00   56.00   1.21 105     200                
750S     Including   17.00  18.00    1.00  13.13                            
750S    KBRC12-018   78.00 105.00   27.00   0.58                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
700S    KBRC12-019    4.00   9.00    5.00   0.36 147     200   Infill Zone 1
                                                                       North
                                                                   extension
700S    KBRC12-019   71.00 131.00   60.00   0.42                            
700S    KBRC12-019  140.00 143.00    3.00   0.35                            
----------------------------------------------------------------------------
700S    KBRC12-020    2.00 148.00  146.00   1.13 153     200   Infill Zone 1
                                                                       North
                                                                   extension
700S     Including   42.00  43.00    1.00  10.07                            
700S     Including  103.00 104.00    1.00  10.61                            
700S     Including  126.00 127.00    1.00  18.52                            
700S     Including  128.00 129.00    1.00  10.29                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
700S    KBRC12-021   10.00  15.00    5.00   0.51 111     200   Infill Zone 1
                                                                       North
                                                                   extension
700S    KBRC12-021   38.00  75.00   37.00   0.46                            
----------------------------------------------------------------------------
700S    KBRC12-022   10.00  15.00    5.00   0.55 147     200   Infill Zone 1
                                                                       North
                                                                   extension
700S    KBRC12-022   49.00  54.00    5.00   1.09                            
700S    KBRC12-022   74.00  97.00   23.00   0.58                            
700S    KBRC12-022  110.00 147.00   37.00   0.67                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
650S    KBRC12-023    2.00  39.00   37.00   0.47 135     200   Infill Zone 1
                                                                       North
                                                                   extension
650S    KBRC12-023   72.00  75.00    3.00   0.30                            
650S    KBRC12-023  118.00 134.00   16.00   0.41                            
----------------------------------------------------------------------------
650S    KBRC12-024    4.00   7.00    3.00   0.35 147     200   Infill Zone 1
                                                                       North
                                                                   extension
650S    KBRC12-024   25.00  53.00   28.00   0.67                            
650S    KBRC12-024   67.00 143.00   76.00   0.48                            
----------------------------------------------------------------------------
650S    KBRC12-025    7.00  19.00   12.00   0.41 139     200   Infill Zone 1
                                                                       North
                                                                   extension
650S    KBRC12-025   33.00 103.00   70.00   0.47                            
650S    KBRC12-025  114.00 117.00    3.00   0.50                            
650S    KBRC12-025  134.00 138.00    4.00   0.51                            
----------------------------------------------------------------------------
650S    KBRC12-026    2.00  11.00    9.00   0.78 147     200   Infill Zone 1
                                                                       North
                                                                   extension
650S    KBRC12-026   24.00  97.00   73.00   0.40                            
650S    KBRC12-026  127.00 130.00    3.00   0.95                            
----------------------------------------------------------------------------
600S    KBRC12-027   10.00  13.00    3.00   0.85 153     200   Infill Zone 1
                                                                       North
                                                                   extension
600S    KBRC12-027   59.00  62.00    3.00   0.30                            
600S    KBRC12-027   75.00 139.00   64.00   0.53                            
----------------------------------------------------------------------------
600S    KBRC12-028    9.00  17.00    8.00   0.54 153     200   Infill Zone 1
                                                                       North
                                                                   extension
600S    KBRC12-028   25.00  71.00   46.00   0.66                            
600S    KBRC12-028   84.00 136.00   52.00   0.66                            
600S    KBRC12-028  145.00 153.00    8.00   0.52                 Hole end in
                                                              mineralization
----------------------------------------------------------------------------
600S    KBRC12-029    5.00  12.00    7.00   0.43 150     200   Infill Zone 1
                                                                       North
                                                                   extension
600S    KBRC12-029   55.00  62.00    7.00   0.91                            
600S    KBRC12-029   78.00 148.00   70.00   0.70               Infill Zone 1
                                                                       North
                                                                   extension
600S     including  135.00 136.00    1.00 11.720               Infill Zone 1
                                                                       North
                                                                   extension
----------------------------------------------------------------------------
1. Significant drilled intercepts have a minimum length of 3m at 0.3 g/t or
   the product "Length X Grade" greater than 0.9 g.m/t. Intercepts are     
   drilled lengths and may not be true width within a structure dipping 70 
  degrees to 80 degrees                                                  
2. Up to 7 m of horizontal "waste" included within mineralized intercept   

 
AGG's management is most encouraged with the drill results being
reported today. More specifically, today's results demonstrate the
continuation of significant gold mineralization being intercepted as
far as 500 meters north of the Company's current 43-101 resource
estimate, reported in July, 2011. This 500 meter northern extension,
contained between sections 1100S thru section 600S, will be
incorporated into a revised resource estimate that forms part of the
Company's ongoing Feasibility Study for the Kobada, Mali gold
project. It is anticipated that a revised resource estimate will be
published on or before April 30, 2013. 
Drill intercepts from section 1000S, located 100 meters north of
AGG's 43-101 resource estimate, were previously reported in a press
release dated November 15, 2011 and included the following near
surface drill intercept highlights: 
Near Surface (Oxide) Drill Highlights From Northern Step-Out Holes On
Section 1000S Include: 


 
--  KBRC11-189: 112 m @ 2.14 g/t Au, incl, 1 m @ 90.19 g/t Au, ended in
    mineralization 
--  KBRC11-192: 88 m @ 1.66 g/t Au, incl 2 m @ 25.60 g/t Au 
--  KBRC11-191: 55 m @ 0.79 g/t Au, incl 1 m @ 15.06 g/t Au 
--  KBRC11-190: 42 m @ 0.96 g/t Au, incl 1 m @ 12.42 g/t Au 
--  KBRC11-193: 12m @ 0.89 g/t Au, ended in mineralization 

 
Drill intercepts from Section 950S and 900S, located up to 200 meters
north of AGG's 43-101 resource estimate, were previously reported in
a press release dated March 20, 2012 and included the following near
surface drill intercept highlights: 
Near Surface (Oxide) Drill Highlights From Northern Step-Out Holes On
Section 950S & 900S Include: 


 
--  KBRC12-006: 70 m @ 1.83 g/t Au & 45 m @ 1.79 g/t Au, ended in
    mineralization 
--  KBRC12-003: 27 m @ 0.47 g/t Au & 84 m @ 1.26 g/t Au, ended in
    mineralization 
--  KBRC12-004: 21 m @ 1.07 g/t & 9 m @ 1.80 Au 
--  KBRC12-005: 21 m @ 1.15 g/t Au 

 
"Today's drill results, detailing holes collared on sections 850S
thru to 600S, clearly show the continuing presence of robust gold
mineralization extending as far as 500 meters north of our current
Zone 1, 43-101 resource. Kobada obviously remains open to the north
along strike and our depth potential is clearly visible with 11 of 20
holes (being reported in this release) ending in mineralization.  
"In addition to demonstrating a strike extension of at least 500
meters north of our current 43-101 resource estimate, the holes that
comprise northern extension also define a mineralized corridor that
exceeds 100 meters in lateral width that are also associated with an
oxidation depth in the magnitude of 100 vertical meters. The
mineralization contained within these northern step out holes is well
distributed down several of the holes, and is as strong as any gold
mineralization encountered in the Zone 1 resource to date," states
AGG President, Michael A. Nikiforuk. 
To view the map associated with this press release, please visit
http://media3.marketwire.com/docs/AGG226MAP.jpg. 
Kobada Review  
On July 14, 2011 AGG announced the results of a positive NI 43-101
Preliminary Economic Assessment (the "PEA" or the "Study") that
evaluates the potential of an open pit, bulk mining model, utilizing
a gravity recovery process plant, at the Company's Kobada (Mali) gold
project. The PEA incorporates and includes drill data up to the end
of December, 2010. There is no drill data from either the 2011 or
2012 campaign included in the PEA. More specifically, the PEA does
not incorporate drill data for the northern extension holes that hold
potential to extend Zone 1 up to 2 kilometers north of the Zone 1
deposit, in addition, the PEA does not incorporate the 2011 southern
holes that hold potential to extend Zone 1 up to 1.55 kilometers
south of the Zone 1 deposit, nor does the Study include any potential
from the newly discovered Foroko North deposit, the newly discovered
Termite Zone or the recently announced Gosso discovery zone, the
latter three discovery zones being separate and distinct structures
from Zone 1. 
Project Economics - Base Case  
The PEA estimates an after-tax Net Present Value (NPV) of US$216.9
million from commencement of construction and an after-tax Internal
Rate Of Return (IRR) of 90.57% using a base case of US$1,100 per
ounce of gold and a discount rate of 5%.  
The Kobada project base case is for processing 20,000 tonnes per day
for a total of 7,000,000 tonnes per year in a gravity process plant
that is projected to recover 87.9% of the gold contained in
41,750,000 tonnes of lateritic material assaying 0.64 g/t Au, for
average annual production of 126,600 ounces of gold for the first
five years of operation. The average annual operating cost is
calculated to be US$8.27/t for the first five years of operation with
a CAPEX of US$122,500,000. The project produces gold at the direct
cost of US$470.90 per ounce. The Study demonstrates that the Kobada
gold project is economically optimized by adopting bulk mining versus
selective mining. The direct implications of bulk mining are
demonstrated in a substantial increase in tonnage and recoverable
gold but with an associated decrease in the average gold grade.
Please visit www.africangoldgroup.com to review the entire content of
AGG's July 14, 2011 press release announcing the results of the
positive Preliminary Economic Assessment. 
Sampling - QA/QC Program  
RC cuttings are recovered at the bottom outlet of the RC rig cyclone
into 50-kg capacity poly-weave bags to recover the cuttings from each
1 meter of drill penetration. Each one meter sample weighs an average
of approximately 19 to 23 kg. Each sample is passed through a 3-tier
Jones Riffler (1 to 8 split), the samples are riffled twice to obtain
from 3 to 5 kg of cuttings which are put in a numbered sample bag.
Each bag is sealed and picked up on site by ALS Chemex Laboratories
for delivery to its Burkina Faso facilities. The remaining 14 to 18
kg of cuttings (field rejects) are stored in camp under tarps to
protect the bags against the elements.  
Original samples are analyzed using Leachwell on 2 kg of pulp.
Leachwell is a bottle roll cyanidation procedure with the addition of
a catalyst to speed up gold dissolution. A QA/QC program is in place
and includes: blank (1 in 20 samples), duplicates (1 in 20),
standards (1 in 20), external lab checks (1 in 30) and two different
analytical procedures checks (1 in 100).  
Under the guidelines of National Instrument 43-101, the qualified
person for the Kobada Gold Project is Mr. Pierre Lalande, P. Geo. Mr.
Lalande is a member of the Association of Professional Geoscientists
of Ontario and has reviewed and approved the contents of this news
release.  
African Gold Group, Inc., based in Toronto, Canada, is fully focused
on transitioning from an exploration/development company into a gold
producer. In conjunction with this objective, a full Feasibility
Study is currently underway for AGG's Kobada, Mali gold project. The
Company is projecting the Feasibility Study will be completed in
Q4/2013, at which time, the Company will submit an application to
obtain an Exploitation License to the appropriate Malian authorities. 
Mineral resources that are not mineral reserves do not have
demonstrated economic viability. The preliminary assessment includes
inferred mineral resources that are considered too speculative
geologically to have the economic considerations applied to them that
would enable them to be categorized as mineral reserves, and there is
no certainty that the preliminary assessment will be realized. 
Additional Information is available on the Company's website at
www.africangoldgroup.com and on www.sedar.com and through the
Company's offices at: Sun Life Financial Tower, Suite 2518, 150 King
St. West, Toronto, Canada 
M5H 1J9. 
On Behalf of the Board:  
Michael A. J. Nikiforuk, President, Director 
Neither the TSX Venture Exchange nor its Regulation Services Provider
(as that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this release. 
Contacts:
African Gold Group, Inc.
Michael A. J. Nikiforuk
(647) 288-0453
majn@africangoldgroup.com
www.africangoldgroup.com
 
 
Press spacebar to pause and continue. Press esc to stop.