Centerra Gold, Initial Oksut Project Resource Estimate and Reserve and Resource Update

Centerra Gold, Initial Oksut Project Resource Estimate and Reserve and Resource 
Update 
Total Gold Reserves 11 Million Contained Ounces 
TORONTO, ONTARIO -- (Marketwire) -- 02/07/13 --  
This news release contains forward-looking information that is
subject to the risk factors and assumptions set out on page 12 and in
our Cautionary Note Regarding Forward-looking Information on page 14.
All figures are in United States dollars. 
Centerra Gold Inc. (TSX:CG) today issued updated 2012 year-end
estimates for the Company's reserves and resources and a fourth
quarter 2012 exploration update. The updated reserves and resources
are based on the new Kumtor KS-13 open pit mine expansion (announced
November 7, 2012) and the Company's successful 2012 exploration
programs.  
Highlights (using $1,350/oz. gold price for reserve estimation): 


 
--  At Centerra's 100% owned Oksut project in Turkey, a new resource
    estimate of 682,000 contained gold ounces of indicated resources and
    477,000 contained gold ounces of inferred resources has been outlined as
    a result of the successful drilling in 2012. 
 
--  Exploration drilling at the Kumtor project in 2012 has further increased
    both open pit and potential underground mineral resources below the KS-
    13 pit design. 
 
--  As a result of the KS-13 open pit expansion, first announced on November
    7th, 2012, the Kumtor proven and probable reserves (as of December 31,
    2012) have increased by 58% or 3.6 million contained ounces of gold
    compared to 6.3 million ounces of gold as of December 31, 2011 and now
    total 9.5 million contained ounces of gold. 

 
During 2012, Centerra's proven and probable gold reserves increased
by 3.6 million contained ounces (before accounting for 2012
production) to 11.1 million ounces of contained gold, compared to 8.1
million ounces as of December 31, 2011. This represents an increase
of 45% before accounting for 534,000 contained ounces processed at
Kumtor and Boroo during 2012. The total reserve increase is the
result of the significant expansion of the Kumtor Central Pit and is
described in detail in a new NI 43-101 technical report filed on
SEDAR in December 2012. All 2012 year-end reserves were estimated
using a gold price of $1,350 per ounce compared to $1,2
00 per ounce
at December 31, 2011. 
In Mongolia, at the Boroo mine, proven and probable reserves total
178,000 contained ounces of gold after accounting for approximately
110,000 contained ounces being processed in the mill and or loaded on
the heap leach pad in 2012. The remaining reserves are now entirely
within existing ore stockpiles on surface. At the current reserve
gold price assumption, the Boroo operation can continue to feed the
mill from stockpiles for approximately two more years and operate and
recover gold from the heap leach pad into 2014. At the Gatsuurt
project, proven and probable reserves remain unchanged at 1.5 million
ounces of contained gold. 
The initial resource estimate for the 100% owned Oksut project in
Turkey has an indicated resource of 682,000 ounces of contained gold
and an inferred resource of 477,000 ounces of contained gold. The
estimated resource is contained in two zones. The Ortacam North Zone
has an indicated resource of 682,000 ounces of contained gold and an
inferred resource of 353,000 ounces of contained gold. The Ortacam
Zone has an inferred resource of 124,000 ounces of contained gold. 
Ian Atkinson, President and CEO of Centerra Gold said: "2012 was
another successful year for Centerra, increasing our reserve and
resource base to over 16 million contained ounces of gold, which does
not include the 4 million contained ounces of gold in the inferred
category. In 2012, we more than replaced reserves mined at Kumtor
with the new KS-13 life-of-mine plan and generated our initial
resource at our 100% owned Oksut deposit in Turkey." 
Year-end Reserves and Resources 
Reserves 
During 2012, Centerra's proven and probable gold reserves increased
by 3.6 million contained ounces (before accounting for 2012
production) to 11.1 million ounces of contained gold, compared to 8.1
million ounces as of December 31, 2011. This represents an increase
of 45% before accounting for 534,000 contained ounces processed at
Kumtor and Boroo during 2012. The total reserve increase is the
result of the significant expansion of the Kumtor Central Pit and is
described in detail in a new NI 43-101 technical report filed on
SEDAR in December 2012. All 2012 year-end reserves were estimated
using a gold price of $1,350 per ounce compared to $1,200 per ounce
at December 31, 2011. 
For the 2012 Kumtor year-end reserve statement in this news release,
the KS-13 model has been updated from the reserve estimate completed
and published at the end of September 2012 by the addition of 17
diamond drill holes and accounting for the gold production and mine
reconciliation completed during the last quarter of 2012.  
In Mongolia, at the Boroo mine, proven and probable reserves total
178,000 contained ounces of gold after accounting for approximately
110,000 contained ounces being processed in the mill and or loaded on
the heap leach pad in 2012. The remaining reserves are now entirely
within existing ore stockpiles on surface. At the current reserve
gold price assumption, the Boroo operation can continue to feed the
mill from stockpiles for approximately two more years and operate and
recover gold from the heap leach pad into 2014. At the Gatsuurt
project, proven and probable reserves remain unchanged at 1.5 million
ounces of contained gold. 
Resources  
As of December 31, 2012, Centerra's measured and indicated resources
decreased by 23% or 1.5 million ounces over the December 31, 2011
figures to total 5.1 million ounces of contained gold, compared to
6.6 million contained ounces as of December 31, 2011. The majority of
this decrease is a result of the conversion of previously outlined
Kumtor Central Pit measured and indicated open pit resources into
mineral reserves as a result of the KS-13 Pit expansion. This
conversion of resources to reserves has been offset by increased
resources at Kumtor described below and the addition of 682,000
contained ounces of new indicated resources at the Oksut project. 
As of December 31, 2012, Centerra's inferred resources increased by
22,000 contained ounces over the December 31, 2011 figures to total
4.1 million ounces of contained gold, the conversion of Kumtor
underground resources into reserves within the KS-13 expanded pit was
offset by new high grade resources outlined below the KS-13 pit
design and the addition of 477,000 contained ounces of new inferred
resources at the Oksut project. 
At Kumtor, as of December 31, 2012, measured and indicated resources
total 2.7 million ounces of contained gold, compared to 4.8 million
contained ounces as of December 31, 2011. The decrease of 2.1 million
ounces is largely attributable to the significant conversion of
resources to reserves as a result of the expanded Central Pit at
Kumtor. The expansion of the open pit converted approximately 2.0
million ounces of contained gold of measured and indicated open pit
resources to reserves. Exploration drilling in 2012 added 400,000
ounces of contained gold to measured and indicated resources and
21,000 ounces of contained gold of the inferred open pit resources
were upgraded to measured and indicated resources. These increases in
the measured and indicated open pit resources were offset by a
reduction of 678,000 ounces of contained gold because of the sma
ller
resource limiting shell used for resource estimation. 
In addition, as a result of detailed delineation drilling completed
in the underground Stockwork Zone in 2012, 121,000 ounces of
contained gold were upgraded from the inferred category to high-grade
underground Stockwork Zone indicated resources. 
Kumtor's inferred resources decreased by 437,000 contained ounces of
gold from 2011 year-end, to total 2.7 million contained ounces of
gold at December 31, 2012, which includes 1.9 million contained
ounces of high-grade underground inferred resources in the SB and
Stockwork Zones. The inferred resources in the high-grade underground
SB Zone decreased by 0.5 million contained ounces to 1.2 million
contained ounces of gold with an average grade of 11.2 g/t. This
reduction is the result of the expansion of the Central Pit, which
captured 1.2 million ounces of contained gold that were previously
classified as part of the high-grade underground SB Zone inferred
resources.  
These inferred resources are now within the new open pit design and
therefore, are included in the Central Pit as probable reserves. This
reduction in inferred resources has been partially offset by the
positive exploration results in 2012 including 17 additional diamond
drill holes completed in the fourth quarter of 2012 after the KS-13
resource estimate was announced in November 2012. These holes have
extended the SB Zone to the southwest and northeast adding 651,000
contained ounces of gold to the high-grade underground SB Zone
inferred resource, which remains open at depth. 
In addition, the high-grade underground Stockwork Zone inferred
resource increased by 76,000 ounces of contained gold to 705,000
ounces of contained gold with an average grade of 11.0 g/t.
Underground drilling in the Stockwork Zone added 168,000 contained
ounces of gold to the inferred resources which was partially offset
by the conversion of 121,000 contained ounces of gold to high grade
Stockwork Zone indicated resources with an average grade of 10.7 g/t. 
At the 100% owned Oksut project in Turkey, Centerra calculated its
initial resource estimate based on the successful 2012 drilling
program. As of December 31, 2012, the Oksut project has an indicated
resource of 682,000 ounces of contained gold and an inferred resource
of 477,000 ounces of contained gold. The resource estimation is
contained in two zones; the Ortacam North Zone which has an indicated
resource of 682,000 ounces of contained gold and an inferred resource
of 353,000 ounces of contained gold and the Ortacam Zone which has an
inferred resource of 124,000 ounces of contained gold. 
The initial Oksut indicated and inferred resource estimate includes
only oxide mineralization and is based upon 52 drill holes in the
Ortacam North Zone and 21 drill holes in the Ortacam Zone. The
resource estimate is contained within a preliminary whittle shell
using a cut-off grade of 0.2 g/t and raw assays were top-cut to 15
g/t before compositing. 
At the ATO project in Mongolia, measured and indicated contained
gold, resources have decreased by 53,000 contained ounces of gold
from 2011 year-end, to a total of 771,000 contained ounces of gold at
December 31, 2012. Extensive metallurgical testwork completed in 2012
has resulted in revised lower process recovery and net smelter return
assumptions for the sulphide mineralization which has lowered the
contained gold resources. This has also decreased the corresponding
contained silver, lead and zinc resources. Some of the decrease has
been offset by increased recovery assumptions for the oxide
mineralization and the addition of 50 new exploration drill holes
completed in 2012. 
Inferred resources at ATO have also decreased by 18,000 contained
ounces of gold from 2011 year-end, to a total of 8,000 contained
ounces of gold at December 31, 2012 as a result of the same factors
outlined above. 
2012 year-end resource estimates on the Boroo, Gatsuurt, Ulan Bulag
properties in Mongolia and Kara Beldyr property in Russia remain
unchanged from those outlined at the end of 2011.  


 
                                   Table 1                                  
                             Centerra Gold Inc.                             
               2012 Year-end Gold Reserve and Resource Summary              
                          (as of December 31, 2012)                         
----------------------------------------------------------------------------
                  Gold Mineral Reserves (1) (3) (13) (14)                   
                      (tonnes and ounces in thousands)                      
----------------------------------------------------------------------------
                                        Proven                      Probable
----------------------------------------------------------------------------
                                     Contained                     Contained
                               Grade      Gold               Grade      Gold
Property(3)         Tonnes     (g/t)      (oz)    Tonnes     (g/t)      (oz)
----------------------------------------------------------------------------
Kumtor (5)           3,149       1.9       196    88,371       3.3     9,270
----------------------------------------------------------------------------
Boroo (7)            7,196       0.8       178                              
----------------------------------------------------------------------------
Gatsuurt (8)                                                                
 (16)                                             16,349       2.8     1,489
----------------------------------------------------------------------------
Total               10,345       1.1       374   104,720       3.2    10,759
----------------------------------------------------------------------------
 
----------------------------------------------
   Gold Mineral Reserves (1) (3) (13) (14)    
       (tonnes and ounces in thousands)       
----------------------------------------------
                     Total Proven and Probable
----------------------------------------------
                                     Contained
                               Grade      Gold
Property(3)         Tonnes     (g/t)      (oz)
----------------------------------------------
Kumtor (5)          91,520       3.2     9,466
----------------------------------------------
Boroo (7)            7,196       0.8       178
----------------------------------------------
Gatsuurt (8)                                  
 (16)               16,349       2.8     1,489
----------------------------------------------
Total              115,065       3.0    11,133
----------------------------------------------
       Gold Measured and Indicated Mineral Resources(2) (3) (13) (14)       
                      (tonnes and ounces in thousands)                      
----------------------------------------------------------------------------
                                      Measured                     Indicated
----------------------------------------------------------------------------
                                     Contained                     Contained
                               Grade      Gold               Grade      Gold
Property(3)         Tonnes     (g/t)      (oz)    Tonnes     (g/t)      (oz)
------------------------
----------------------------------------------------
Kumtor Open Pit                                                             
 (4) (5)            21,975       2.3     1,631    12,113       2.3       898
----------------------------------------------------------------------------
Kumtor Stockwork                                                            
 Underground (6)                                     351      10.7       121
----------------------------------------------------------------------------
Boroo (4) (7)          452       2.2        32     4,464       1.5       210
----------------------------------------------------------------------------
Gatsuurt (4) (8)                                                            
 (16)                                              5,533       2.4       426
----------------------------------------------------------------------------
Ulaan Bulag (9)                                    1,555       1.5        73
----------------------------------------------------------------------------
ATO (10)             9,663       1.5       465     8,920       1.1       306
----------------------------------------------------------------------------
Kara Beldyr (11)                                   3,790       2.4       289
----------------------------------------------------------------------------
Oksut(12)                                         15,404       1.4       682
----------------------------------------------------------------------------
Total               32,090       2.1     2,128    52,130       1.8     3,005
----------------------------------------------------------------------------
 
      Gold Measured and Indicated Mineral     
          Resources(2) (3) (13) (14)          
       (tonnes and ounces in thousands)       
----------------------------------------------
                  Total Measured and Indicated
----------------------------------------------
                                     Contained
                               Grade      Gold
Property(3)         Tonnes     (g/t)      (oz)
----------------------------------------------
Kumtor Open Pit                               
 (4) (5)            34,088       2.3     2,529
----------------------------------------------
Kumtor Stockwork                              
 Underground (6)       351      10.7       121
----------------------------------------------
Boroo (4) (7)        4,916       1.5       242
----------------------------------------------
Gatsuurt (4) (8)                              
 (16)                5,533       2.4       426
----------------------------------------------
Ulaan Bulag (9)      1,555       1.5        73
----------------------------------------------
ATO (10)            18,583       1.3       771
----------------------------------------------
Kara Beldyr (11)     3,790       2.4       289
----------------------------------------------
Oksut(12)           15,404       1.4       682
----------------------------------------------
Total               84,220       1.9     5,133
----------------------------------------------
                                                                            
----------------------------------------------------------------------------
  Gold Inferred Mineral Resources(2) (3) (13)                               
                   (14) (15)                                                
       (tonnes and ounces in thousands)                                     
----------------------------------------------                              
                                                                            
----------------------------------------------                              
                               Grade Contained                              
Property(3)         Tonnes     (g/t) Gold (oz)                              
----------------------------------------------                              
Kumtor Open Pit                                                             
 (4) (5)             9,339       2.4       712                              
----------------------------------------------                              
Kumtor Stockwork                                                            
 Underground (6)     2,002      11.0       705                              
----------------------------------------------                              
Kumtor SB Zone                                                              
 UG (6)              3,413      11.2     1,229                              
----------------------------------------------                              
Boroo (4) (7)        7,323       1.0       235                              
----------------------------------------------                              
Gatsuurt (4) (8)                                                            
 (16)                5,926       2.6       491                              
----------------------------------------------                              
Ulaan Bulag (9)        315       1.3        13                              
----------------------------------------------                              
ATO (10)               386       0.7         8                              
----------------------------------------------                              
Kara Beldyr (11)     3,354       2.0       211                              
----------------------------------------------                              
Oksut (12)          14,009       1.1       477                              
----------------------------------------------------------------------------
Total               46,067       2.8     4,081                              
----------------------------------------------------------------------------
 
1.  The mineral reserves have been estimated based on a gold price of $1,350
    per ounce. 
2.  Mineral resources are in addition to reserves. Mineral resources do not
    have demonstrated economic viability. 
3.  Centerra's equity interests as of this news release are: Kumtor 100%,
    Gatsuurt 100%, Boroo 100%, Ulaan Bulag 100%, ATO 100%, Oksut 100% and
    Kara Beldyr 70%. All contained ounces in table above are shown on a 100%
    basis. 
4.  Open pit resources occur outside the current ultimate pits which have
    been designed using a gold price of $1,350 per ounce. 
5.  The open pit reserves and resources at Kumtor are estimated based on a
    cut-off grade of 0.85 gram of gold per tonne for the Central Pit and 1.0
    grams of gold per tonne for the Southwest, Sarytor and Northeast
    deposits. 
6.  Underground resources occur below the Central pit and are estimated
    based on a cut-off grade of 6.0 grams of gold per tonne. 
7.  The open pit reserves and resources at Boroo are estimated based on a
    0.5 gram of gold per tonne cut-off grade. 
8.  The open pit reserves and resources at Gatsuurt are estimated using
    either a 1.2, 1.4 or 1.5 grams of gold per tonne cut-off grade depending
    on ore type and process method and include the Central Zone and Main
    Zone deposits. 
9.  The open pit resources at Ulaan Bulag are estimated on a cut-off grade
    of 0.8, 0.9 or 1.0 grams of gold per tonne depending on ore type and
    process method. 
10. The ATO open pit resources are estimated based on a Net Smelter Return
    (NSR) cut-off grade of $6.50 NSR per tonne for oxide mineralization and
    $25.50 NSR per tonne for sulphide mineralization. 
11. The open pit resources at Kara Beldyr are estimated based on a 1.0 gram
    of gold per tonne cut-off grade and the contained ounces are shown on a
    100% basis. 
12. The Open pit resources at Oksut are estimated based on a 0.2 gram of
    gold per tonne cut-off grade. 
13. A conversion factor of 31.10348 grams per ounce of gold is used in the
    reserve and resource estimates. 
14. Numbers may not add up due to rounding. 
15. Inferred mineral resources have a great amount of uncertainty as to
    their existence and as to whether they ca
n be mined economically. It
    cannot be assumed that all or part of the inferred resources will ever
    be upgraded to a higher category. 
16. In July 2009, the Mongolian Parliament enacted legislation that would
    prohibit mineral prospecting, exploration and mining in water basins and
    forest areas in the territory of Mongolia and provides for the
    revocation of mining and exploration licenses affecting such areas. The
    legislation exempts any "mineral deposit of strategic significance". If
    the legislation is not repealed or amended or if Gatsuurt is not
    designated as a "mineral deposit of strategic importance" that is exempt
    from this legislation, mineral reserves at Gatsuurt may have to be
    reclassified as mineral resources or eliminated entirely. 
 
                               Table 1 (cont.)                              
                 2012 Year-End Polymetallic Resource Summary                
                          (as of December 31, 2012)                         
-----------------------------------------------------------------
                                             Contained           
                                       Gold       Gold     Silver
                          Tonnes      Grade   (22) (oz      Grade
Category                 (000's)      (g/t)     000's)      (g/t)
-----------------------------------------------------------------
         ATO Project  (17) (18) (19) (20) (21) (23) (24)         
-----------------------------------------------------------------
                     Oxide Mineral Resources                     
             (greater than $6.50 NSR cut-off Grade)             
-----------------------------------------------------------------
Measured Resources         3,677        1.3        148        8.5
-----------------------------------------------------------------
Indicated Resources        3,294        0.7         78        7.2
-----------------------------------------------------------------
Measured and                                                     
 Indicated                 6,971        1.0        226        7.9
-----------------------------------------------------------------
                                                                 
-----------------------------------------------------------------
Inferred Resources                                               
 (19)                         87        0.8          2        4.9
-----------------------------------------------------------------
Sulphide Mineral Resources (greater than $25.50 NSR cut-off     
 Grade)                                                          
-----------------------------------------------------------------
Measured Resources         5,986        1.7        318       8.02
-----------------------------------------------------------------
Indicated Resources        5,626        1.3        228       8.52
-----------------------------------------------------------------
Measured and                                                     
 Indicated                11,612        1.5        545       8.26
-----------------------------------------------------------------
                                                                 
-----------------------------------------------------------------
Inferred Resources                                               
 (19)                        299        0.6          6       5.78
-----------------------------------------------------------------
 
----------------------------------------------------------------------------
                       Contained       Lead  Contained       Zinc  Contained
                          Silver      Grade       Lead      Grade       Zinc
Category              (oz 000's)        (%) (lb 000's)        (%) (lb 000's)
----------------------------------------------------------------------------
               ATO Project  (17) (18) (19) (20) (21) (23) (24)              
----------------------------------------------------------------------------
                          Oxide Mineral Resources                           
                   (greater than $6.50 NSR cut-off Grade)                  
----------------------------------------------------------------------------
Measured Resources         1,010                                            
----------------------------------------------------------------------------
Indicated Resources          758                                            
----------------------------------------------------------------------------
Measured and                                                                
 Indicated                 1,768                                            
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Inferred Resources                                                          
 (19)                         14                                            
----------------------------------------------------------------------------
Sulphide Mineral Resources (greater than $25.50 NSR cut-off Grade)         
----------------------------------------------------------------------------
Measured Resources         1,543      0.979    129,197      1.704    224,874
----------------------------------------------------------------------------
Indicated Resources        1,541      0.803     99,598      1.447    179,474
----------------------------------------------------------------------------
Measured and                                                                
 Indicated                 3,085      0.894    228,795      1.579    404,349
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Inferred Resources                                                          
 (19)                         56      1.025      6,757      2.306     15,201
----------------------------------------------------------------------------
 
17. Mineral resources have been estimated on the following metal prices
    (gold $1,350 per ounce), (silver $20 per ounce), (lead $ 0.87 per lb),
    (zinc $0.87 per lb). 
18. Mineral resources do not have demonstrated economic viability. 
19. Inferred mineral resources have a great amount of uncertainty as to
    their existence and as to whether they can be mined economically. It
    cannot be assumed that all or part of the inferred resources will ever
    be upgraded to a higher category. 
20. Centerra's equity interest in the ATO project is 100%. 
21. Numbers may not add up due to rounding. 
22. The contained gold resources have also been included in Centerra's 2012
    Year-end Gold Reserve and Resource Summary. 
23. The ATO resources are estimated based on a Net Smelter Return cut-off
    grade of $6.50 NSR per tonne for oxide mineralization and $25.50 NSR per
    tonne for sulphide mineralization. 
24. Variables used to calculate NSR values include: 
    --  Oxide total recovery of gold=69.8%
        
    --  Oxide total recovery of Silver=56.7%
        
    --  Sulphide Net Smelter Return total recovery of gold=59.9%
        
    --  Sulphide Net Smelter Return total recovery of silver=48.5%
        
    --  Sulphide Net Smelter Return total recovery of lead=42.6%
        
    --  Sulphide Net Smelter Return total recovery of zinc=27.7%
        
    --  Payable royalty on total recovered gold=10.0%
        
    --  Payable royalty on total recovered silver=6.75%
        
    --  Payable royalty on total recovered lead=6.75% 
 
                                   Table 2                                  
                             Centerra Gold Inc.                             
                Reconciliation of Gold Reserve
s and Resources               
           (in thousands of ounces of contained gold) (4) (8) (9)           
----------------------------------------------------------------------------
                                                         2012               
                                                     Addition               
                    December 31           2012     (Deletion)    December 31
                        2011(1)  Throughput(2)            (3)           2012
----------------------------------------------------------------------------
                  Gold Proven and Probable Mineral Reserves                 
----------------------------------------------------------------------------
Kumtor (5)                6,278            424          3,612          9,466
----------------------------------------------------------------------------
Boroo                       298            110            (10)           178
----------------------------------------------------------------------------
Gatsuurt (7)                                                                
 (11)                     1,489              0              0          1,489
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Total Proven and                                                            
 Probable                                                                   
 Reserves                 8,065            534          3,602         11,133
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
                Gold Measured and Indicated Mineral Resources               
------------------------------------------------------------------
----------
Kumtor (6)                4,799              0         (2,270)         2,529
----------------------------------------------------------------------------
Kumtor Stockwork                                                            
 Underground                  0              0            121            121
----------------------------------------------------------------------------
Boroo                       242              0              0            242
----------------------------------------------------------------------------
Gatsuurt (7)                                                                
 (11)                       426              0              0            426
----------------------------------------------------------------------------
Ulaan Bulag                  73              0              0             73
----------------------------------------------------------------------------
ATO                         824              0            (53)           771
----------------------------------------------------------------------------
Kara Beldyr                 289              0              0            289
----------------------------------------------------------------------------
Oksut                         0              0            682            682
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Total Measured &                                                            
 Indicated                                                                  
 Resources                6,653              0         (1,520)         5,133
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
                    Gold Inferred Mineral Resources (10)                    
----------------------------------------------------------------------------
Kumtor Open Pit                                                             
 (6)                        694              0             18            712
----------------------------------------------------------------------------
Kumtor Stockwork                                                            
 Underground                629              0             76            705
----------------------------------------------------------------------------
Kumtor SB                                                                   
 Underground              1,760              0           (531)         1,229
----------------------------------------------------------------------------
Boroo                       235              0              0            235
----------------------------------------------------------------------------
Gatsuurt (7)                                                                
 (11)                       491              0              0            491
----------------------------------------------------------------------------
Ulaan Bulag                  13              0              0             13
----------------------------------------------------------------------------
ATO                          26              0            (18)             8
----------------------------------------------------------------------------
Kara Beldyr                 211              0              0            211
----------------------------------------------------------------------------
Oksut                         0              0            477            477
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Total Inferred                                                              
 Resources                4,059              0             22          4,081
----------------------------------------------------------------------------
                                                                            
(1)  Reserves and resources as reported in Centerra's Annual Information    
     Form filed in March 2012.                                              
(2)  Corresponds to mill feed at Kumtor and mill feed or stacked ore on heap
     leach pad at Boroo.                                                    
(3)  Changes in reserves or resources, as applicable, are attributed to     
     information provided by drilling and subsequent reclassification of    
     reserves or resources, an increase in the gold price, changes in pit   
     designs, reconciliation between the mill and the resource model, and   
     changes to operating costs.                                            
(4)  Centerra's equity interests as of
 this news release are as follows:    
     Kumtor 100%, Gatsuurt 100%, Boroo 100%, Ulaan Bulag 100%, ATO 100%,    
     Oksut 100% and Kara Beldyr 70%. Contained ounces are on a 100% basis in
     the table above at each property.                                      
(5)  Kumtor open pit reserves include the Central Pit and the Southwest and 
     Sarytor Deposits.                                                      
(6)  Kumtor open pit resources include the Central Pit, Southwest Deposit,  
     Sarytor Deposit and Northeast Deposit.                                 
(7)  Gatsuurt open pit reserves and resources include the Central Zone and  
     Main Zone deposits.                                                    
(8)  Centerra reports reserves and resources separately. The amount of      
     reported resources does not include those amounts identified as        
     reserves.                                                              
(9)  Numbers may not add up due to rounding.                                
(10) Inferred mineral resources have a great amount of uncertainty as to    
     their existence and as to whether they can be mined economically. It   
     cannot be assumed that all or part of the inferred resources will ever 
     be upgraded to a higher category.                                      
(11) In July 2009, the Mongolian Parliament enacted legislation that would  
     prohibit mineral prospecting, exploration and mining in water basins   
     and forest areas in the territory of Mongolia and provides for the     
     revocation of mining and exploration licenses affecting such areas. The
     legislation exempts any "mineral deposit of strategic significance". If
     the legislation is not repealed or amended or if Gatsuurt is not       
     designated as a "mineral deposit of strategic importance" that is      
     exempt from this legislation, mineral reserves at Gatsuurt may have to 
     be reclassified as mineral resources or eliminated entirely.           

 
Exploration Update 
To view the graphics, maps/drill sections and complete drill results
discussed in this news release, please visit the following link:
http://file.marketwire.com/release/CG-Map207.pdf 
or visit the Company's web site at: www.centerragold.com. 
Kyrgyz Republic 
During the fourth quarter of 2012, exploration drilling programs
continued in the Kumtor Central Pit and from Declines 1 and 2,
infilling and testing for extensions to the SB Zone and the SW
Extension of the Kumtor deposit.  
Kumtor Pit 
In the Central Pit, drilling focused on infilling and expanding
portions of the SB and Southwest Extension Zones within and below the
KS-13 pit design. Eleven holes were completed and another four holes
were in progress at the end of the quarter. 
Drilling results received in the quarter include a number of robust
intercepts that largely infill the KS-13 reserve and the SB
Underground inferred resource published on November 7, 2012. Better
results i
nclude 6.8 g/t gold over 95.3 metres (including 14.0 g/t
over 26.6 metres) in hole D1675 and 5.1 g/t gold over 75.4 metres in
D1671. Both holes targeted the SB Zone on Section 18 and lie within
the limits of the KS-13 pit design. Forty metres to the east on
Section 22, holes D1674 intersected 10.1 g/t gold over 38.0 metres
(including 21.2 g/t over 8.4 metres). D1674A, a re-drill of the ore
zone from a wedge higher up in hole D1674, intersected 10.2 g/t gold
over 63.0 metres (including 34.7 g/t over 3.9 metres and 20.7 g/t
over 11.9 metres). These holes infill the SB Zone in the lower
portion of the KS-13 pit. Another hole, D1682, intersected 5.8 g/t
gold over 87.9 metres (including 11.8 g/t over 21.0 metres and 19.8
g/t over 4.0 metres) immediately below the KS-13 pit and within the
SB Underground inferred resource. 
Hole D1687, designed to test the SB Zone some 250 metres below the
KS-13 pit bottom, intersected 4.4 g/t gold over 105.8 metres
(including 15.0 g/t over 3.7 metres). It is an infill hole within the
SB Underground inferred resource. 
Hole D1681 intersected 12.4 g/t gold over 47.9 metres (including 26.8
g/t over 11.2 metres) on Section 26 near the bottom of the new KS-13
pit design. Forty metres further east on Section 30, hole D1690
intersected 8.3 g/t gold over 57.2 metres (including 16.6 g/t gold
over 21.3 metres). This hole also lies within the KS-13 pit.  
Further east on Section 38, hole D1692 intersected 6.0 g/t gold over
40.0 metres (including 15.1 g/t over 3.5 metres) and 5.8 g/t gold
over 49.0 metres (including 13.1 g/t over 10.4 metres). Forty metres
east on Section 42, hole D1672 intersected 8.9 g/t gold over 44.9
metres (including 37.3 g/t gold over 4.0 metres and 18.3 g/t over 4.1
metres) and 6.3 g/t gold over 9.7 metres (including 15.0 g/t over 3.3
metres) on Section 42. Both holes lie 150 to 200 metres below the
KS-13 pit and have had a positive impact on year-end resource
calculations. 
All of these drilling results have been incorporated into the
year-end resource update. 
Exploration drilling will continue to infill and expand the SB
Underground resource in 2013 subject to the availability of drill
platforms in the Central Pit. Drilling is also planned for the
western limits of the Southwest Extension of the SB Zone and for the
Sarytor and Northeast deposits. 
Decline Exploration 
Nine exploration holes were drilled from Declines 1 and 2 to infill
portions of the Southwest Extension and the SB Zones. Seven of the
nine holes stopped short of their targeted depths due to difficult
drilling conditions, but all nine holes intersected zones of gold
mineralization. Better results include 40.7 g/t gold over 2.0 metres,
14.4 g/t gold over 5.0 metres and 5.2 g/t gold over 30.5 metres in
hole UD1676 on Section -14 and 18.0 g/t gold over 2.0 metres and 10.4
g/t gold over 15.5 metres in UD1689 on Section -6. Further east on
Section 6, hole UD1666 intersected 6.9 g/t gold over 22.6 metres
(including 17.5 g/t over 5.5 metres). Also, on Section 6, hole UD1680
reported 3.8 g/t gold over 13.0 metres before it stopped short of
completion due to drilling problems. 
Two deep underground holes were drilled from Decline 2 to target
deeper portions of the SB Zone that were inaccessible from the
Central Pit. Hole UD1670 intersected 2.4 g/t gold over 55.2 metres
before being abandoned, and hole UD1688 intersected 3.1 g/t gold over
49.9 metres (including 8.1 g/t gold over 3.2 metres) before also
being abandoned for technical reasons. 
True widths for the mineralized zones are typically from 70 to 95% of
the stated intercept. 
Underground drilling ended in November 2012, following the Company's
decision to expand the Kumtor Central Pit and cease underground
development activities. 
Regional Exploration 
No regional exploration activities took place during the quarter.  
Mongolia 
ATO Project  
Thirty holes were completed on the ATO project during the fourth
quarter of 2012. The holes were drilled to test for extensions to the
current resource along the limits of the pipe-like bodies and in
apparent feeder zones at depth. Better results from these 30 holes
and from 26 holes completed in the prior quarter include:  


 
ATO-208   1.3 g/t gold; 6.9 g/t silver; 1.5% lead and 3.1% zinc over 64.3   
           metres                                                           
ATO-211   1.9 g/t gold; 7.4 g/t silver and 1.7% lead over 13.5 metres       
          0.8 g/t gold; 3.7 g/t silver; 1.0% lead and 1.7% zinc over 57.8   
           metres                                                           
ATO-214   1.9 g/t gold; 6.4 g/t silver; 1.2% lead and 1.3% zinc over 9.8    
           metres                                                           
ATO-218   2.1 g/t gold; 41.6 g/t silver; 0.3% lead and 0.6% zinc over 95.9  
           metres                                                           
ATO-219   1.7 g/t gold; 4.2 g/t silver; 0.1% lead and 0.2% zinc over 17.4   
           metres                                                           
ATO-220   4.0 g/t gold; 10.8 g/t silver; 2.1% lead and 3.6% zinc over 21.0  
           metres                                                           
ATO-225   2.3 g/t gold; 2.2 g/t silver; 0.3% lead and 0.2% zinc over 17.6   
           metres                                                           
ATO-248   1.3 g/t gold; 3.9 g/t silver over 31.7 metres                     
          2.1 g/t gold; 2.7 g/t silver; 0.7% lead and 1.1% zinc over 71.5   
           metres                                                           

 
True widths of the mineralized zones are from 50 to 90% of the stated
interval. 
Overall, drilling results close off mineralization on the west side
of Pipes 1 and 2 and expand the eastern limits of Pipes 1 and 4. The
drilling also extends mineralization at depth, where precious metal
values decrease and base-metal values increase. These drilling
results have been included in the 2012 year-end resource update for
ATO.  
Russia 
Kara Beldyr Joint Venture 
Eleven holes were drilled at Camp Zone during the fourth quarter of
2012 to infill areas of initial high-grade results. Four holes were
also completed at the Baran Zone to test a large gap in the existing
drilling. Better results from Camp Zone include:  


 
KB-154:   2.4 g/t Au over 5.0 metres                                        
KB-155:   1.8 g/t Au over 9.0 metres                                        
KB-156:   2.9 g/t Au over 4.0 metres                                        
KB-158:   0.9 g/t Au over 9.4 metres                                        
KB-164:   125.4 g/t Au over 3.4 metres and 4.2 g/t Au over 1.2 metres       

 
The drilling extends Camp Zone 150 metres to the northeast before
closing it off. Drilling also closed off the deposit at depth.
Several holes are planned to test a soil anomaly approximately 500
metres northeast of Camp Zone.  
Results from the four holes at Baran Zone include one narrow,
high-grade intercept (19.0 g/t gold over 2.4 metres in KB-162).
Overall, drilling results outline a narrow, discontinuous zone of
mineralization and enveloping alteration. No additional work is
planned at Baran Zone.  
True widths for the mineralized zones are from 20 to 90% of the
stated intercept. 
The results of the 2012 Kara Beldyr program are being compiled to
determine the size and scope of the 2013 exploration program. 
Turkey 
Oksut Project  
In the fourth quarter of 2012, 18 diamond drill holes were completed
and final results were received for 23 holes. Fifteen infill and
step-out holes were drilled at the Ortacam North deposit, and a
single hole each was completed at the Ortacam deposit (ODD96),
Kizilagil (ODD71) and Devetasi (ODD78). Better results from the
quarter include: 


 
ODD70 (step-out):   0.6 g/t Au over 106.6 metres                            
ODD74 (step-out):   1.0 g/t Au over 35.8 metres                             
ODD79 (infill):     0.9 g/t Au over 67.3 metres                             
ODD80 (infill):     3.3 g/t Au over 196.3 metres                            
ODD81 (infill):     1.4 g/t Au over 73.4 metres                             
                    0.9 g/t Au over 56.2 metres EOH                         
ODD82 (infill):     0.4 g/t Au over 212.5 metres                            
ODD83 (step-out):   0.6 g/t Au over 106.0 metres                            
ODD84 (step-out):   1.1 g/t Au over 33.9 metres                             
ODD85 (infill):     1.4 g/t Au over 209.5 metres                            
ODD86 (infill):     2.2 g/t Au over 269.2 metres                            
ODD87 (infill):     2.5 g/t Au over 248.0 metres                            
ODD88 (infill):     1.0 g/t Au over 238.8 metres                            
ODD89 (infill):     1.1 g/t Au over 143.4 metres                            
ODD90 (infill):     1.1 g/t Au over 176.0 metres                            
                    0.6 g/t Au over 115.4 metres                            
ODD91 (infill):     0.7 g/t Au over 44.4 metres                             
                    0.6 g/t Au over 169.4 metres                            
ODD92 (step-out):   0.8 g/t Au over 42.7 metres                             
ODD93 (step-out):   0.6 g/t Au over 30.0 metres                             
ODD94 (infill):     1.2 g/t Au over 170.6 metres                            
ODD96 (infill):     0.6 g/t Au over 67.2 metres                             
                    0.5 g/t Au over 69.4 metres                             

 
True widths for the mineralized zones are from 50 to 90% of the
stated intercept. 
Results from holes ODD70-89 were previously reported in Centerra
Gold's news release of December 12, 2012. Results from holes ODD90-94
and ODD96 are new results received after the December 12th news
release. All of these drilling results have been used in the year-end
resource calculation. 
Step-out drilling at 100-metre spacing has closed off the Ortacam
North deposit to the north and west beyond the limits of the
diatreme-breccia host rock. The deposit remains open to the east,
beneath andesite cover, and to the southeast towards the smaller
Ortacam deposit. The deposit is also open at depth below the
oxide/sulphide boundary where several holes have intersected gold and
supergene copper. 
The Ortacam North deposit measures approximately 550 by 250-300
metres in plan and, locally, is up to 200 metres thick. The deposit
is zoned outward from a core of massive silica breccia to enveloping
vuggy quartz + alunite rock. Quartz-kaolinite rock, commonly
developed in massive andesite, surrounds the deposit and generally
contains less than 0.2 g/t gold. 
PQ core from a metallurgical drill hole was composited into three
sample types for bottle-roll and column leach test work at the SGS
facility in Cornwall, England. Final results are expected in the
first quarter of 2013 and will be used to plan a more extensive
program of metallurgical drilling and column-leach test work. 
Results were received for 99 core samples submitted for specific
gravity measurements. The principal ore-bearing rock types - massive
silica and vuggy quartz-alunite rock - displayed a wide range of
values in the initial results. Another 117 samples were collected and
submitted for analysis late in 2012. All 218 values have been used to
assign densities in the year-end resource model. 
To view the graphics, maps/drill sections and complete drill results
discussed in this news release, please visit the following link:
http://file.marketwire.com/release/CG-Map207.pdf 
or visit the Company's web site at: www.centerragold.com. 
Material Assumptions & Risks 
Material assumptions or factors used to estimate reserves and costs
for 2013 include the following: 


 
--  a gold price of $1,350 per ounce, 
--  exchange rates: 
    --  $1USD:$0.99 CAD 
    --  $1USD:47.0 Kyrgyz som 
    --  $1USD:1,375 Mongolian tugriks 
    --  $1USD:0.78 Euro 
--  diesel fuel price assumption: 
    --  $0.80/litre at Kumtor 
    --  $1.18/litre at Boroo 

 
The assumed diesel price of $0.80/litre at Kumtor assumes that no
Russian export duty will be paid on the fuel exports from Russia to
the Kyrgyz Republic. Diesel fuel is sourced from separate Russian
suppliers for both sites and only loosely correlates with world oil
prices. The diesel fuel price assumptions were made when the price of
oil was approximately $87 per barrel.  
Other material assumptions include the following: 


 
--  any recurrence of political or civil unrest in the Kyrgyz Republic will
    not impact operations, including movement of people, supplies and gold
    shipments to and from the Kumtor mine, 
--  the activities of the Parliamentary Committee and State Commission,
    referred to under the heading "Other Corporate Developments - Kyrgyz
    Republic - Kyrgyz Republic Parliamentary Commission Report and State
    Commission" in Centerra's management's discussion and analysis for the
    quarter ended September 30, 2012 filed on November 7, 2012 (the "Q3 2012
    MD&A") do not have an impact on operations or financial results. No
    assurances can be given by the Company in this regard, 
--  the Government of the Kyrgyz Republic taking no action in connection
    with the matters referred to under the heading "Other Corporate
    Developments - Kyrgyz Republic - Kyrgyz Republic Parliamentary
    Commission Report and State Commission" in the Q3 2012 MD&A that has an
    impact on operations or financial results. No assurances can be given by
    the Company in this regard, 
--  the previously disclosed environmental claims received from the Kyrgyz
    regulatory authorities in the amount of $152 million, in aggregate, (see
    news release of December 14, 2012) and any further claims that may
    result from the State Commission, are resolved without material impact
    on Centerra's operations or financial results. No assurances can be
    given by the Company in this regard, 
--  grades and recoveri
es at Kumtor will remain consistent with the life-of-
    mine plan to achieve the forecast gold production, 
--  the Company is able to manage the risks associated with the increased
    height of the pit walls at Kumtor over the life-of-mine, 
--  the design of the new and expanded waste dumps (contemplated by the new
    KS-13 life-of-mine plan) at Kumtor adequately address the risks
    associated with size and stability, 
--  the dewatering program at Kumtor continues to produce the expected
    results and the water management system works as planned, 
--  the Company is able to satisfactorily manage the ice movement and to
    unload the ice and waste in the southeast portion of the Kumtor pit, 
--  prices of key consumables are not significantly higher than prices
    assumed in planning, 
--  no unplanned delays in or interruption of scheduled production from our
    mines, including due to civil unrest, natural phenomena, regulatory or
    political disputes, equipment breakdown or other developmental and
    operational risks, 
--  the Mongolian legislation which prohibits mineral prospecting,
    exploration and mining in water basins and forest areas in Mongolia (the
    "Water and Forest Law") will be amended or repealed to allow Gatsuurt to
    proceed as planned, (see Company's most recently filed AIF), 
--  the royalty paid by Boroo increases to 10% after the Boroo stability
    agreement expires in July 2013 and the current 25% income tax rate
    remains unchanged, and 
--  all necessary permits, licenses and approvals are received in a timely
    manner. 

 
Reserve estimates and cost forecasts are forward-looking information
and are based on key assumptions and subject to material risk
factors. If any event arising from these risks occurs, the Company's
business, prospects, financial condition, results of operations or
cash flows and the market price of Centerra's shares could be
adversely affected. Additional risks and uncertainties not currently
known to the Company, or that are currently deemed immaterial, may
also materially and adversely affect the Company's business
operations, prospects, financial condition, results of operations or
cash flows and the market price of Centerra's shares. See the section
entitled "Risk Factors" in the Company's most recently filed Annual
Information Form (the "2011 Annual Information Form"), available on
SEDAR at www.sedar.com and see also the discussion below under the
heading "Cautionary Note Regarding Forward-looking Information". 
Qualified Person & QA/QC 
All exploration information and related scientific and technical
information in this news release were prepared in accordance with the
standards of the Canadian Institute of Mining, Metallurgy and
Petroleum and National Instrument 43-101 - Standards of Disclosure
for Mineral Projects ("NI 43-101") and were prepared, reviewed,
verified and compiled by Centerra's geological and mining staff under
the supervision of David Groves, Certified Professional Geologist,
Centerra's Vice President, Global Exploration, who is the qualified
person for the purpose of NI 43-101. Sample preparation, analytical
techniques, laboratories used and quality assurance-quality control
protocols used during the exploration drilling programs are done
consistent with industry standards and independent certified assay
labs are used with the exception of the Kumtor project as described
in its technical report filed on December 20th, 2012, with an
effective date of September 30, 2012 (the "Kumtor Technical Report"). 
All reserve and resource estimates, production information and other
related scientific and technical information in this news release
were prepared in accordance with the standards of the Canadian
Institute of Mining, Metallurgy and Petroleum and National Instrument
43-101 - Standards of Disclosure for Mineral Projects and were
prepared, reviewed, verified and compiled by Centerra's geological
and mining staff under the supervision of Dan Redmond, Ontario
Professional Geoscientist, Centerra's Director, Technical Services -
Mining, who is the qualified person for the purpose of NI 43-101.
Sample preparation, analytical techniques, laboratories used and
quality assurance-quality control protocols used during the
exploration drilling programs are done consistent with industry
standards and independent certified assay labs are used with the
exception of the Kumtor project as described in its Technical Report. 
The Kumtor deposit is described in a technical report dated December
20, 2012, which is filed on SEDAR at www.sedar.com. The technical
report describes the exploration history, geology and style of gold
mineralization at the Kumtor deposit. Sample preparation, analytical
techniques, laboratories used and quality assurance-quality control
protocols used during the drilling programs at the Kumtor site are
described in the technical report. 
The Boroo deposit is described in Centerra's 2011 Annual Information
Form and a technical report dated December 17, 2009 prepared in
accordance with NI 43-101, which is available on SEDAR at
www.sedar.com. The technical report describes the exploration
history, geology and style of gold mineralization at the Boroo
deposit. Sample preparation, analytical techniques, laboratories used
and quality assurance-quality control protocols used during the
drilling programs at the Boroo site are the same as, or similar to,
those described in the technical report. 
The Gatsuurt deposit is described in Centerra's 2011 Annual
Information Form and a technical report dated May 9, 2006 prepared in
accordance with NI 43-101. The technical report has been filed on
SEDAR at www.sedar.com. The technical report describes the
exploration history, geology and style of gold mineralization at the
Gatsuurt deposit. Sample preparation, analytical techniques,
laboratories used and quality assurance-quality control protocols
used during the drilling programs at the Gatsuurt project are the
same as, or similar to, those described in the technical report. 
Cautionary Note Regarding Forward-looking Information 
This news release and the documents referred to herein contain
statements which are not statements of current or historical facts
and are "forward-looking information" within the meaning of
applicable Canadian securities laws. Such forward-looking information
involves risks, uncertainties and other factors that could cause
actual results, performance, prospects and opportunities to differ
materially from those expressed or implied by such forward-looking
information. Wherever possible, words such as "believe", "expect",
"anticipate", "contemplate", "target", "plan", "intends", "continue",
"budget", "forecast", "projections", "estimate", "may", "will",
"schedule", "potential", "strategy" and other similar expressions
have been used to identify forward-looking information.  
These forward-looking statements relate to, among other things, the
activities of the Kyrgyz Republic Government with respect to the
State Commission report, the Company's ability to resolve matters
relating to the State Commission, including the receipt of
environmental claims for aggregate amount of $152 million and the
discussions with the Kyrgyz officials regarding the continued
validity of the project agreements for the Kumtor project without
material adverse consequences to the Company's operations; 2013
exploration plans and the success thereof; Centerra's statements
regarding future growth, results of operations, future production and
sales, operating capital expenditures, and performance; the Company's
ability to successfully manage the ice and waste movement at Kumtor;
the outcome of discussions with the new Mongolian government on the
way forward for the Company's Gatsuurt deposit; the impact of the
Water and Forest Law on the Company's Mongolian activities; business
and political environment and business prospects; and the timing and
development of new deposits. 
Although the forward-looking information in this
 news release
reflects Centerra's current beliefs as of the date of this news
release based on information currently available to management and
based upon what management believes to be reasonable assumptions,
Centerra cannot be certain that actual results, performance,
achievements, prospects and opportunities, either expressed or
implied will be consistent with such forward-looking information.
Forward-looking information is necessarily based upon a number of
estimates and assumptions that, while considered reasonable by
Centerra, are inherently subject to significant political, business,
economic and competitive uncertainties and contingencies. Known and
unknown factors could cause actual results to differ materially from
those projected in the forward-looking information.  
Other factors that could cause actual results or events to differ
materially from current expectations include, among other things, the
matters listed in this news release under the heading "Material
Assumptions and Risks"; risks related to operational matters,
including the waste and ice movement at the Kumtor Project and the
Company's continued ability to successfully manage it, the occurrence
of further ground movements at the Kumtor Project, the success of the
Company's future exploration and development activities, including
the financial and political risks inherent in carrying out
exploration activities, the adequacy of the Company's insurance to
mitigate operational risks, mechanical breakdowns, the Company's
ability to obtain the necessary permits and authorizations to raise
the tailings dam at the Kumtor Project to the required height, the
Company's ability to replace its mineral reserves, the occurrence of
any labour unrest or disturbance and the ability of the Company to
successfully re-negotiate collective agreements when required,
seismic activity in the vicinity of the Company's operations in the
Kyrgyz Republic and Mongolia, long lead times required for equipment
and supplies given the remote location of the Company's properties,
reliance on a limited number of suppliers for certain consumables,
equipment and components, illegal mining on the Company's Mongolian
properties, the Company's ability to accurately predict
decommissioning and reclamation costs, the Company's ability to
attract and retain qualified personnel, competition for mineral
acquisition opportunities, and risks associated with the conduct of
joint ventures; political and regulatory risks, including the
political risks associated with the Company's principal operations in
the Kyrgyz Republic and Mongolia, resource nationalism, the impact of
changes in, or to the more aggressive enforcement of, laws,
regulations and government practices in the jurisdictions in which
the Company operates, the impact of any actions taken by the Kyrgyz
Republic Government and Parliament as a result of the Kyrgyz State
Commission on Kumtor, any impact on the purported cancellation of
Kumtor's land use rights at the Kumtor Project, the effect of the
Water and Forest Law on the Company's operations in Mongolia, the
effect of the 2006 Mongolian Minerals Law on the Company's Mongolian
operations, the effect of the November 2010 amendments to the 2006
Mongolian Minerals Law on the royalties payable in connection with
the Company's Mongolian operations, the impact of continued scrutiny
from Mongolian regulatory authorities on the Company's Boroo project,
the impact of changes to, or the increased enforcement of,
environmental laws and regulations relating to the Company's
operations, the Company's ability to successfully negotiate an
investment agreement for the Gatsuurt project to complete the
development of the mine and the Company's ability to obtain all
necessary permits and commissions needed to commence mining activity
at the Gatsuurt project; risks relating to financial matters
including the sensitivity of the Company's business to the volatility
of gold prices, the imprecision of the Company's mineral reserves and
resources estimates and the assumptions they rely on, the accuracy of
the Company's production and cost estimates, the impact of
restrictive covenants in the Company's revolving credit facility
which may, among other things,
restrict the Company from pursuing certain business activities, the
Company's ability to obtain future financing, the impact of global
financial conditions, the impact of currency fluctuations, the effect
of market conditions on the Company's short-term investments, the
Company's ability to make payments including any payments of
principal and interest on the Company's debt facilities depends on
the cash flow of its subsidiaries; risks related to environmental and
safety matters, including the ability to continue obtaining necessary
operating and environmental permits, licenses and approvals, the
impact of the significant environmental claims made in December 2012
relating to the Kumtor Project, inherent risks associated with using
sodium cyanide in the mining operations; legal and other factors such
as litigation, defects in title in connection with the Company's
properties, the Company's ability to enforce its legal rights, risks
associated with having a significant shareholder, and possible
director conflicts of interest. There may be other factors that cause
results, assumptions, performance, achievements, prospects or
opportunities in future periods not to be as anticipated, estimated
or intended. See "Risk Factors" in the Company's most recently filed
Annual Information Form available on SEDAR at www.sedar.com.  
Furthermore, market price fluctuations in gold, as well as increased
capital or production costs or reduced recovery rates may render ore
reserves containing lower grades of mineralization uneconomic and may
ultimately result in a restatement of reserves. The extent to which
resources may ultimately be reclassified as proven or probable
reserves is dependent upon the demonstration of their profitable
recovery. Economic and technological factors which may change over
time always influence the evaluation of reserves or resources.
Centerra has not adjusted mineral resource figures in consideration
of these risks and, therefore, Centerra can give no assurances that
any mineral resource estimate will ultimately be reclassified as
proven and probable reserves.  
Centerra's mineral reserve and mineral resource figures are estimates
and Centerra can provide no assurances that the indicated levels of
gold will be produced or that Centerra will receive the gold price
assumed in determining its mineral reserves. Such estimates are
expressions of judgment based on knowledge, mining experience,
analysis of drilling results and industry practices. Valid estimates
made at a given time may significantly change when new information
becomes available. While Centerra believes that these mineral reserve
and mineral resource estimates are well established and the best
estimates of Centerra's management, by their nature mineral reserve
and mineral resource estimates are imprecise and depend, to a certain
extent, upon analysis of drilling results and statistical inferences
which may ultimately prove unreliable. If Centerra's reserve or
reserve estimates for its properties are inaccurate or are reduced in
the future, this could have an adverse impact on Centerra's future
cash flows, earnings, results or operations and financial condition.  
Centerra estimates the future mine life of its operations. Centerra
can give no assurance that mine life estimates will be achieved.
Failure to achieve these estimates could have an adverse impact on
Centerra's future cash flows, earnings, results of operations and
financial condition.  
There can be no assurances that forward-looking information and
statements will prove to be accurate, as many factors and future
events, both known and unknown could cause actual results,
performance or achievements to vary or differ materially from the
results, performance or achievements that are or may be expressed or
implied by
 such forward-looking statements contained in this news
release. Accordingly, all such factors should be considered carefully
when making decisions with respect to Centerra, and prospective
investors should not place undue reliance on forward-looking
information. Forward-looking information is as of February 7, 2013.
Centerra assumes no obligation to update or revise forward-looking
information to reflect changes in assumptions, changes in
circumstances or any other events affecting such forward-looking
information, except as required by applicable law. 
About Centerra 
Centerra is a gold mining company focused on operating, developing,
exploring and acquiring gold properties primarily in Asia, the former
Soviet Union and other emerging markets worldwide. Centerra is a
leading North American-based gold producer and is the largest
Western-based gold producer in Central Asia. Centerra's shares trade
on the Toronto Stock Exchange (TSX) under the symbol CG. The Company
is headquartered in Toronto, Ontario, Canada. 
Additional information on Centerra is available on the Company's web
site at www.centerragold.com and at SEDAR at www.sedar.com.
Contacts:
Centerra Gold Inc.
John W. Pearson
Vice President, Investor Relations
(416) 204-1241
john.pearson@centerragold.com