Cartier Resources Inc.: Drilling Below the Benoist Deposit

Cartier Resources Inc.: Drilling Below the Benoist Deposit Follows Up
on 2012 Results 
VAL-D'OR, QUEBEC -- (Marketwire) -- 01/17/13 -- Cartier Resources
Inc. (TSX VENTURE:ECR) ("Cartier") announces that a drill program is
currently underway on the Benoist property. 
The drilling objective is to intersect, at a vertical depth between
400 m and 600 m, the extension of the Pusticamica gold deposit and
the extensions of the new gold zone discovered in 2012 (see figure).
The work, consisting of 6 drill holes totalling 4,200 m, will be
completed in late March 2013. 
In 1993, Minnova calculated historical resources for the Pusticamica
gold deposit (Murgor Resources press release of January 17, 2012).
The set of sections for this deposit illustrate the potential for
increasing the volume of mineralization at depth. The new 2012 gold
zone is positioned 450 m below the Pusticamica deposit. It consists
of high gold grades up to 24.5 g/t Au over 3.0 m, enclosed within a
gold-bearing envelope with drilled grades on the order of one gram of
gold over intervals of more than 100 m. 
"The discovery of the new 2012 gold zone below the Pusticamica gold
deposit suggests that the deposit's mineralization continues at
depth", commented Philippe Cloutier, President and CEO. 
The Benoist property is 65 km northeast of the town of
Lebel-sur-Quevillon, 25 km from the Bachelor gold mine in
Desmaraisville, and 25 km from the Gonzague-Langlois zinc-copper mine
belonging to Nyrstar. 
About Cartier 
The company's objective is to develop and maintain a balanced
portfolio of mining projects ranging from exploration to resource
definition, development and production. Its VISION is to develop the
company's current and future assets into mineral production within a
timeframe that is consistent with its human and financial resources
while respecting sustainable development practices. 
Quality Assurance / Quality Control 
The scientific and/or technical information presented in this press
release has been reviewed and approved by Mr. Philippe Berthelot,
P.Geo., Senior Geologist-Exploration for Cartier. Mr. Berthelot is a
qualified person as defined by National Instrument 43-101. 
Two figures associated with this press release are available at these
addresses : http://www.ressourcescartier.
com/sites/ressourcescartier2
/flipbook/benoist3dmodel/index.phpand 
http://www.ressourcescartier.com/en/sites/RessourcesCartier2/Medi
a.ashx?MediaId=2e4d4455-3617-426f-80bb-e2c65922c237 
Neither the TSX Venture Exchange nor its regulatory services provider
accepts responsibility for the adequacy or accuracy of this press
release. 
Contacts:
Philippe Cloutier
President and CEO
Cartier Resources Inc.
819 874-1331 or Toll-free: 877-874-1331
819 874-3113 (FAX)
info@ressourcescartier.com
www.ressourcescartier.com
 
 
Press spacebar to pause and continue. Press esc to stop.