Paramount Resources Ltd. (TSX:POU) ("Paramount" or the

Paramount Resources Ltd. (TSX:POU) ("Paramount" or the "Company")
Announces Its Third Quarter 2012 Results: Behind Pipe Natural Gas
Inventory Exceeds 200 MMcf/d (150 MMcf/d Net) 
CALGARY, ALBERTA -- (Marketwire) -- 11/06/12 -- Paramount Resources
Ltd. (TSX:POU) 
OPERATIONAL UPDATE 
Oil and Gas Operations 


 
--  Sales volumes in the third quarter were impacted by scheduled and
    unscheduled third party downstream NGLs processing disruptions, which
    shut-in up to 6,000 Boe/d of Paramount's production. The Company was
    able to partially restore sales volumes to approximately 20,000 Boe/d by
    the end of October after the affected third party NGLs facility resumed
    service. Paramount's production continues to be impacted by the
    availability of downstream NGLs fractionation capacity as third party
    operators prorate available NGLs processing capacity. 
    
--  Operating expenses decreased to $8.50 per Boe in the third quarter of
    2012 from $9.88 per Boe in 2011 due to the cost savings from the
    Company's 45 MMcf/d Musreau refrigeration facility (the "Musreau Refrig
    Facility") and the sale of higher cost US properties. 
    
--  Paramount received regulatory approval in July 2012 for the 200 MMcf/d
    Musreau deep cut facility. Site preparation work commenced in the third
    quarter of 2012, construction work is continuing to progress, and
    equipment deliveries are expected to begin before the end of the year. 
    
--  Advance drilling for the deep cut facility expansions at Musreau and
    Smoky continued. The Company currently has an inventory of 31 (24 net)
    wells with estimated first month deliverability exceeding 200 MMcf/d
    (150 MMcf/d net) of raw gas.  
    
--  Paramount has completed drilling and fracture stimulation operations at
    its first five-well pad at Musreau, where three (2.5 net) Montney
    formation wells and two (1.5 net) Falher formation wells were drilled
    and completed for an aggregate gross cost of approximately $37 million.
    Average gross raw gas test rates for the five wells aggregated to
    approximately 55 MMcf/d over the final 24 hours of their test periods,
    with flowing pressures averaging 2,500 PSI. 

 
Strategic Investments 


 
--  The Company has commenced drilling its
 second exploratory vertical
    evaluation well on its Liard Basin Besa River shale gas lands. 
    
--  Construction of Paramount's two new walking drilling rigs is nearing
    completion with the first rig scheduled to commence drilling for the
    Kaybob COU in December and the second expected to commence drilling in
    January 2013.  

 
Corporate 


 
--  Paramount raised an aggregate $125.1 million through the issuance of a
    total of 4.2 million flow-through Common Shares in late-September and
    early-October. 
    
--  Paramount is continuing to work on a proposal from one of its lenders
    for an expansion of the Company's bank credit facility and, as a result,
    the revolving period and maturity date of the existing $300 million bank
    credit facility (the "Existing Facility") have been extended to November
    15, 2012 and November 15, 2013, respectively. Paramount expects that the
    revolving period and maturity date of the Existing Facility would be
    further extended if such facility is not expanded before November 15,
    2012. 
    
--  A $6.2 million settlement was received in the third quarter in respect
    of a business interruption insurance claim related to an electrical
    equipment failure at the Musreau Refrig Facility in the fourth quarter
    of 2011. 
    
 
----------------------------------------------------------------------------
Financial and Operating Highlights(1,2)                                     
----------------------------------------------------------------------------
($ millions, except as noted)                                               
--------------------------------------------------------------------------- 
                               Three months ended         Nine months ended 
                                     September 30              September 30 
                                                %                         % 
                           2012      2011  Change     2012     2011  Change 
----------------------------------------------------------------------------
Financial                                                                   
Petroleum and natural                                                       
 gas sales                 41.3      70.5     (41)   142.5    178.4     (20)
Funds flow from                                                             
 operations                15.5      32.8     (53)    40.4     70.2     (42)
 Per share - diluted                                                        
  ($/share)                0.18      0.42     (57)    0.46     0.91     (49)
Net income (loss)         (34.6)    (22.4)    (54)    89.9    (22.1)    507 
 Per share - basic                                                          
  ($/share)               (0.40)    (0.28)    (43)    1.05    (0.29)    462 
 Per share - diluted                                                        
  ($/share)               (0.40)    (0.28)    (43)    1.03    (0.29)    455 
Exploration and                                                             
 development                                                                
 expenditures             147.7     107.0      38    356.3    321.7      11 
Investments in other                                                        
 entities - market                                                          
 value(3)                                            656.6    812.3     (19)
Total assets                                       1,903.0  1,737.9       9 
Net debt(4)                                          569.1    589.6      (3)
Common shares                                                               
 outstanding (thousands)                            87,489   79,002      11 
                                                                            
Operating                                                                   
Sales volumes                                                               
 Natural gas (MMcf/d)      95.3      97.8      (3)    96.7     78.2      24 
 NGLs (Bbl/d)             1,755     2,062     (15)   1,793    1,515      18 
 Oil (Bbl/d)              1,081     2,344     (54)   1,756    2,269     (23)
 Total (Boe/d)           18,712    20,707     (10)  19,663   16,820      17 
Average realized price                                                      
 Natural gas ($/Mcf)       2.58      4.12     (37)    2.46     4.20     (41)
 NGLs ($/Bbl)             60.65     80.82     (25)   69.42    80.09     (13)
 Oil ($/Bbl)              81.28     79.42       2    83.96    84.81      (1)
 Total ($/Boe)            24.00     37.03     (35)   26.46    38.85     (32)
                                                                            
Net wells drilled                                                           
 (excluding oil sands                                                       
 evaluation)                  9        15     (40)      28       35     (20)
Net oil sands evaluation                                                    
 wells drilled                -         -       -        1       27     (96)
                                                                            
---------------------------------
-------------------------------------------
(1) Readers are referred to the advisories concerning non-GAAP measures and 
    oil and gas definitions in the "Advisories" section of this document.   
(2) Amounts include the results of discontinued operations. Refer to pages 6
    and 7 of Paramount's Management's Discussion and Analysis for the three 
    and nine months ended September 30, 2012.                               
(3) Based on the period-end closing prices of publicly traded enterprises   
    and the book value of the remaining investments.                        
(4) Net debt is a non-GAAP measure, it is calculated and defined in the     
    Liquidity and Capital Resources section of Paramount's Management's     
    Discussion and Analysis for the three and nine months ended September   
    30, 2012.                                                               
                                                                            
                                                                            
----------------------------------------------------------------------------
REVIEW OF OPERATIONS                                                        
----------------------------------------------------------------------------
                              Third Quarter    Second Quarter               
                                  2012             2012(1)         % Change 
----------------------------------------------------------------------------
Sales volumes                                                               
 Natural gas (MMcf/d)             95.3              106.2               (10)
 NGLs (Bbl/d)                     1,755             1,973               (11)
 Oil (Bbl/d)                      1,081             1,808               (40)
                            ------------------------------------            
 Total (Boe/d)                   18,712            21,474               (13)
                            ------------------------------------            
                                                                            
Netbacks ($ millions)                                              % Change 
                                   ($/Boe)(2)         ($/Boe)(2)   in $/Boe 
 Natural gas revenue          22.6      2.58     20.3      2.09          23 
 NGLs revenue                  9.8     60.65     12.5     69.63         (13)
 Oil revenue                   8.1     81.28     12.8     78.65           3 
 Royalty and sulphur revenue   0.8         -      0.9         -           - 
                            ------------------------------------            
 Petroleum and natural gas                                                  
  sales                       41.3     24.00     46.5     23.82           1 
 Royalties                    (2.8)    (1.62)    (3.9)    (2.00)        (19)
 Operating expense and                                                      
  production tax             (14.6)    (8.50)   (15.9)    (8.20)          4 
 Transportation               (4.9)    (2.85)    (5.7)    (2.90)         (2)
                            ------------------------------------            
Netback                       19.0     11.03     21.0     10.72           3 
 Financial commodity                                                        
  contract settlements         0.2      0.10      0.4      0.23         (57)
                            ------------------------------------            
Netback including financial                                                 
 commodity contract                                                         
 settlements                  19.2     11.13     21.4     10.95           2 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
(1) Amounts include the results of discontinued operations. Refer to pages 6
    and 7 of Paramount's Management's Discussion and Analysis for the three 
    and nine months ended September 30, 2012.                               
(2) Natural gas revenue shown per Mcf.                                      

 
During the third quarter Paramount continued to add production as new
wells were brought-on in the Grande Prairie COU and liquids handling
processes at the Musreau Refrig Facility were optimized. Natural gas
and NGLs sales volumes decreased compared to the second quarter
because of scheduled and unscheduled third party downstream NGLs
processing disruptions (the "NGLs Disruption"). The NGLs Disruption
required Paramount to restrict NGLs recovery rates and curtail
production in the Kaybob and Grande Prairie COUs. As a result, the
Company's sales volumes were reduced by up to 6,000 Boe/d between
mid-August and mid-October. 
By the end of October, the Company was able to partially restore
sales volumes to approximately 20,000 Boe/d after the affected third
party NGLs facility resumed service. Paramount's production continues
to be impacted by the availability of downstream NGLs fractionation
capacity as third party operators prorate available NGLs processing
capacity.  
Petroleum and natural gas sales revenue decreased by $5.2 million
quarter over quarter primarily due to lower sales volumes and lower
realized NGLs prices, partially offset by higher realized natural gas
and oil prices. Operating costs per Boe increased four percent
compared to the second quarter, primarily due to third quarter
scheduled maintenance work and the impact of lower sales volumes over
the fixed portion of operating expenses. 


 
----------------------------------------------------------------------------
Kaybob                                                                      
----------------------------------------------------------------------------
                                 Third Quarter    Second Quarter            
                                     2012              2012        % Change 
----------------------------------------------------------------------------
Sales Volumes                                                               
 Natural gas (MMcf/d)                56.0              66.3             (16)
 NGLs (Bbl/d)                         843              1,132            (26)
 Oil (Bbl/d)                          55                61              (10)
                              ------------------------------------          
 Total (Boe/d)                      10,225            12,236            (16)
                              ------------------------------------          
Exploration and Development                                                 
 Expenditures ($ millions)                                                  
 Exploration, drilling,                                                     
  completions and tie-ins            70.8              16.9             319 
 Facilities and gathering            37.7              23.0              64 
                              ------------------------------------          
                                     108.5             39.9             172 
                              ------------------------------------          
                                  Gross      Net    Gross      Net          
                              ------------------------------------          
Wells
 Drilled                         7      5.7        7      4.7          
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 
Sales volumes in the Kaybob COU averaged approximately 11,500 Boe/d
through July and August. As a result of the NGLs Disruption,
production across the Kaybob COU was curtailed to less than 6,500
Boe/d by the middle of September, including temporarily reducing
throughput at the Musreau Refrig Facility to 10 MMcf/d. Following the
resolution of the NGLs Disruption in mid-October, Kaybob COU sales
volumes have once again increased to over 11,000 Boe/d.  
The Kaybob COU's third quarter operating costs were approximately
$5.00 per Boe, before accounting for the impact of third party
processing income. The Musreau Refrig Facility provides significant
savings to the Company through the elimination of third party
processing fees. In the third quarter, Paramount received a $6.2
million settlement in respect of a business interruption insurance
claim related to an electrical equipment failure at the Musreau
Refrig Facility in the fourth quarter of 2011.  
Paramount has completed drilling and fracture stimulation operations
at its first five-well pad at Musreau, where three (2.5 net) Montney
formation wells and two (1.5 net) Falher formation wells were drilled
and completed for an aggregate gross cost of approximately $37
million. Average gross raw gas test rates for the five wells
aggregated to approximately 55 MMcf/d over the final 24 hours of
their test periods, with flowing pressures averaging 2,500 PSI. The
efficiencies gained from concentrating activities at a single pad
location have reduced per well capital costs and will result in lower
operating expenses. The Company plans to continue to utilize
multi-well pad sites to realize these cost savings. 
Construction activities have commenced at the 200 MMcf/d deep cut
facility at Musreau (the "Musreau Deep Cut Facility"). Foundation
work is underway and equipment deliveries are scheduled to commence
by the end of the year. The Company has incurred approximately $70
million of costs related to the Musreau Deep Cut Facility to
September 30, 2012 and anticipates spending an additional $50 million
during the remainder of 2012. The facility is expected to be
commissioned in the second half of 2013 at an estimated total cost of
approximately $180 million.  
Paramount has initiated a project to construct an amine processing
train at the Musreau Deep Cut Facility, which will provide the
capability to treat sour gas production at the plant instead of at
well sites. This enhancement is expected to reduce ongoing operating
costs and decrease equipping costs by over $1 million per well. The
Company is currently finalizing the design of the amine train, which
is expected to cost approximately $50 million, and the procurement of
long lead-time components has commenced for a planned start-up in the
first half of 2014. The addition of the amine train will not delay
commissioning of the Musreau Deep Cut Facility.  
Paramount is also participating in the expansion of a non-operated
processing facility at Smoky (the "Smoky Deep Cut Facility"), which
is being upgraded to operate as a deep cut liquids extraction plant.
The Company will have a 20 percent interest in the expanded facility,
up from its 10 percent share of the existing 100 MMcf/d dew point
facility. The Smoky Deep Cut Facility will initially have 200 MMcf/d
of raw gas capacity upon start-up, increasing to 300 MMcf/d through
the later installation of an incremental 100 MMcf/d of compression.
As a plant owner, Paramount has the option at any time to request the
installation of the additional compression, which would bring the
Company's total owned capacity in the plant to 60 MMcf/d.
Construction work commenced at the site in the third quarter with the
installation of pilings and foundations and major equipment is being
manufactured. The expansion is scheduled to be commissioned in the
first half of 2014. 
Paramount has entered into a long-term firm-service agreement with a
midstream company to de-ethanize and fractionate Kaybob area NGLs
volumes. The midstream company has undertaken to expand its
facilities to process Paramount's NGLs streams, which will secure
NGLs processing for the volumes that will be produced from the Kaybob
area deep cut facilities. Paramount has also entered into an
agreement in principle with a petro-chemical producer on long-term
arrangements for the sale of the Company's ethane production and is
negotiating long-term arrangements for the transportation of its
Kaybob area natural gas and NGLs volumes.  
During the third quarter, the Kaybob COU drilled five (3.7 net)
horizontal Falher formation wells, one (1.0 net) horizontal Montney
well and one (1.0 net) horizontal Wilrich well. Twelve (9.3 net)
wells were fracture stimulated including one (1.0 net) Montney
formation well. Test results have been consistent with expectations,
further confirming the Company's well performance profiles.  
Paramount's experience over the past few years in the Deep Basin has
enabled the Company to refine its development programs and reduce the
cost of new wells by improving drilling techniques, using more cost
effective fracture stimulations and improving logistics with
multi-well pad sites. Drilling days for the latest four Falher wells
have been reduced to less than 25 days compared to 45 or more days
for wells drilled in 2010. The latest two Montney wells were drilled
in 45 and 41 days compared to an average of over 80 days for three
similar wells drilled in 2011. Paramount has also been able to
negotiate lower rates for services, equipment and completion fluids. 
The following table summarizes the current status of Kaybob Deep
Basin wells that have been drilled and are awaiting production, the
estimated remaining capital required to complete these wells, and
their anticipated production and sales volumes: 


 
                               Total                                        
                             Remaining      Estimated         Estimated     
                              Capital      Net Raw Gas        Net Sales     
                  Wells        (net)      Production(1)       Volumes(2)    
              --------------------------------------------------------------
                                           First    First    First    First 
                                           Month     Year    Month     Year 
                           -------------------------------------------------
               Gross   Net  ($ millions) (MMcf/d) (MMcf/d)  (Boe/d)  (Boe/d)
Shut-in due to                                                              
 capacity                                                                   
 contraints        4     4            1       13        6    4,100    2,100 
Tied-in,                                                                    
 capable of                                                                 
 producing         6     3            -       20        9    5,500    2,500 
Completed,                                                                  
 awaiting tie-                                                              
 in               12    10           11       66       32   20,000   10,000 
Drilled,                                                                    
 awaiting                                                                   
 completion        9     7           29       52       22   14,100    6,100 
----------------------------------------------------------------------------
                  31    24           41      151       69   43,700   20,700 
----------------------------------------------------------------------------
(1) Based on the Company's 4.9 Bcf type curve for Falher wells and 3.7 Bcf  
    type curve for Montney wells.                                           
(2) Based on p
rocessing through a deep cut facility.                        

 
The Company plans to drill up to an additional six wells for the
remainder of 2012, with more wells to be drilled in 2013 to continue
building behind pipe production in advance of completing the plant
expansions at Musreau and Smoky.  


 
----------------------------------------------------------------------------
Grande Prairie                                                              
----------------------------------------------------------------------------
                                 Third Quarter    Second Quarter            
                                     2012              2012        % Change 
----------------------------------------------------------------------------
Sales Volumes                                                               
 Natural gas (MMcf/d)                21.6              21.5               - 
 NGLs (Bbl/d)                         733               658              11 
 Oil (Bbl/d)                          251               269              (7)
                              ------------------------------------          
 Total (Boe/d)                       4,587             4,514              2 
                              ------------------------------------          
Exploration and Development                                                 
 Expenditures ($ millions)                                                  
 Exploration, drilling,                                                     
  completions and tie-ins            15.1              12.3              23 
 Facilities and gathering             9.9               6.5              52 
                              ------------------------------------          
                                     25.0              18.8              33 
                              ------------------------------------          
                                  Gross      Net    Gross      Net          
                              ------------------------------------          
Wells Drilled                         -        -        3      2.1          
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 
Average sales volumes in the Grande Prairie COU exceeded 6,000 Boe/d
for two weeks in August as wells completed in the first half of the
year were brought-on at Valhalla and Karr-Gold Creek. As a result of
the NGLs Disruption, production at Valhalla that had been processed
through a third party deep cut facility was diverted to a dew point
facility in order to reduce the volume of NGLs extracted from the gas
stream during processing. Paramount is limited to 10 MMcf/d of
capacity at the dew point facility, which has resulted in
approximately 8 MMcf/d of natural gas production being shut-in at
Valhalla. The Company is maintaining sales volumes in the Grande
Prairie COU between 4,000 and 4,500 Boe/d due to ongoing NGLs
capacity limitations. Production will be increased as additional NGLs
processing capacity becomes available.  


 
--------------------------------------------------------------------------- 
Southern                                                                    
--------------------------------------------------------------------------- 
                                 Third Quarter  Second Quarter(1)           
                                     2012              2012        % Change 
----------------------------------------------------------------------------
Sales Volumes                                                               
 Natural gas (MMcf/d)                 9.2               9.8              (6)
 NGLs (Bbl/d)                         148               169             (12)
 Oil (Bbl/d)                          594              1,250            (52)
                              ------------------------------------          
 Total (Boe/d)                       2,270             3,059            (26)
                              ------------------------------------          
Exploration and Development                                                 
 Expenditures ($ millions)                                                  
 Exploration, drilling,                                                     
  completions and tie-ins             6.4               1.9             237 
 Facilities and gathering             0.3               0.7             (57)
                              ------------------------------------          
                                      6.7               2.6             158 
                              ------------------------------------          
                                  Gross      Net    Gross      Net          
                              ------------------------------------          
Wells Drilled                         2      2.0        -        -          
----------------------------------------------------------------------------
----------------------------------------------------------------------------
(1) Amounts include the results of discontinued operations. Refer to pages 6
    and 7 of Paramount's Management's Discussion and Analysis for the three 
    and nine months ended September 30, 2012.                               

 
Third quarter sales volumes in the Southern COU decreased mainly
because of the May 2012 United States property disposition.
Production volumes were also impacted by a compression equipment
failure at Chain and a turnaround at a third party downstream
facility in Ricinus - Harmattan. 
In the third quarter the Southern COU drilled two (2.0 net)
liquids-rich natural gas wells in Harmattan.  


 
--------------------------------------------------------------------------- 
Northern                                                                    
--------------------------------------------------------------------------- 
                                 Third Quarter    Second Quarter            
                                     2012              2012        % Change 
----------------------------------------------------------------------------
Sales Volumes                                                               
 Natural gas (MMcf/d)                 8.5               8.6              (1)
 NGLs (Bbl/d)                         31                14              121 
 Oil (Bbl/d)                          181               228             (21)
                              ------------------------------------          
 Total (Boe/d)                       1,630             1,665             (2)
                              ------------------------------------          
Exploration and Development                                                 
 Expenditures ($ millions)                                                  
 Exploration, drilling,                                                     
  completions and tie-ins             2.0               0.6             233 
 Facilities and gathering             1.6               1.9             (16)
                              ------------------------------------          
                                      3.6               2.5              44 
                              ------------------------------------          
                                  Gross      Net    Gross      Net          
                              ------------------------------------          
Wells Drilled                         1      1.0        -        -          
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 
Third quarter sales volumes in the Northern COU were impacted by a
forest fire near the Company's processing facility at Bistcho which
shut-in approximately 1,250 Boe/d of production for 15 days in July.  
In Northeast British Columbia, modifications are being c
ompleted to
surface facilities for the Company's initial well at Birch to be
re-started later in November. Three Birch wells drilled to date have
targeted the upper Montney formation. In the third quarter, Paramount
drilled a vertical evaluation well into the lower Montney formation
at Birch. The well will be completed and, depending on test results,
the Company will have the option of drilling and completing a
horizontal leg in the lower or upper Montney formation.  
STRATEGIC INVESTMENTS 
In November 2012, Cavalier Energy Inc. ("Cavalier Energy") plans to
submit a regulatory application for the first phase of development at
the Hoole property, a 10,000 Bbl/d project targeting the Grand Rapids
formation using proven SAGD technologies. Cavalier Energy believes
that first steam could commence as early as the second half of 2015.
Longer-term plans for Hoole include three additional 30,000 Bbl/d
phases that would increase production to 100,000 Bbl/d by 2024. 
SHALE GAS 
Paramount's Besa River shale gas holdings are focused in the Liard
Basin in Northeast British Columbia and the Northwest Territories.
The Company began drilling its second Liard Basin shale gas
evaluation well at Patry in October. The well is expected to be
drilled to a vertical depth of 3,500 meters and will be cored and
logged for evaluation. In early 2013 Paramount plans to finish
drilling its initial shale gas evaluation well at Dunedin after
drilling was suspended in the spring of 2012 due to warm weather.
Paramount's exploratory drilling activities are expected to extend
the mineral rights surrounding the well locations for an additional
decade and provide information to be used for future development.  
CORPORATE 
Paramount is continuing to work on a proposal from one of its lenders
for an expansion of the Company's bank credit facility and, as a
result, the revolving period and maturity date of the Existing
Facility have been extended to November 15, 2012 and November 15,
2013, respectively. Paramount expects that the revolving period and
maturity date of the Existing Facility would be further extended if
such facility is not expanded before November 15, 2012. 
Paramount raised an aggregate $125.1 million through the issuance of
a total of 4.2 million flow-through Common Shares in late-September
and early-October. 
OUTLOOK 
Year-to-date exploration and development expenditures total
approximately $360 million. Planned spending for the remainder of the
year will be focused on the Kaybob deep cut projects, where $65
million will be invested in the Musreau and Smoky deep cut facilities
and drilling will continue to build the inventory of wells to feed
the expansions. Strategic Investment spending for the remainder of
the year will be directed to completing the construction of the new
walking drilling rigs and drilling the Company's second Liard Basin
shale gas evaluation well. The Company has flexibility within its
current capital plan to increase or decrease spending depending on
future economic conditions, among other factors. 
Between August and October, Paramount's sales volumes were
constrained by up to 6,000 Boe/d due to the NGLs Disruption. By the
end of October, the Company was able to partially restore sales
volumes to approximately 20,000 Boe/d after the affected third party
NGLs facility resumed service. Paramount's production continues to be
impacted by the availability of downstream NGLs fractionation
capacity as third party operators prorate available NGLs processing
capacity. The Company's 2012 exit rate will depend on the extent to
which downstream third party NGLs processing capacity becomes
available. Behind pipe volumes in the Kaybob and Grande Prairie COUs
will be brought-on once the Company is able to access additional
fractionation capacity.  
Paramount's long-term firm-service agreement with a midstream company
secures processing capacity for NGLs that will be produced from the
Kaybob area deep cut facilities. Sales volumes are expected to more
than double once the Musreau Deep Cut Facility and the Smoky Deep Cut
Facility are operational. 
ADDITIONAL INFORMATION 
A copy of Paramount's complete results for the three and nine months
ended September 30, 2012, including Management's Discussion and
Analysis and the unaudited Interim Condensed Consolidated Financial
Statements for the three and nine months ended September 30, 2012 can
be found at http://media3.marketwire.com/docs/1106pou.pdf. This
information will also be made available through Paramount's website
at www.paramountres.com and SEDAR at www.sedar.com. 
ABOUT PARAMOUNT 
Paramount Resources Ltd. is a Canadian oil and natural gas
exploration, development and production company with operations
focused in Western Canada. Paramount's common shares are listed on
the Toronto Stock Exchange under the symbol "POU". 
ADVISORIES 
FORWARD-LOOKING INFORMATION 
Certain statements in this document constitute forward-looking
information under applicable securities legislation. Forward-looking
information typically contains statements with words such as
"anticipate", "believe", "estimate", "expect", "plan", "intend",
"propose", or similar words suggesting future outcomes or an outlook.
Forward looking information in this document includes, but is not
limited to:  


 
--  expected production and sales volumes and the timing thereof; 
--  operating and other costs; 
--  the negotiation and completion of arrangements for the transportation
    and sales of natural gas and NGLs;  
--  exploration, development and strategic investment plans and strategies
    and the anticipated costs, timing and results thereof;  
--  budget allocations and capital spending flexibility; 
--  planned drilling programs, well completions, well tie-ins and the
    anticipated costs  and timing thereof;  
--  the availability of facilities to process and transport natural gas and
    NGLs production; 
--  the anticipated costs, scope and timing of proposed new facilities and
    facilities' expansions, the expected capacity and utilization of such
    facilities and expected sources of funding for such facilities; 
--  the timing and scope of Cavalier Energy's planned development of its oil
    sands and carbonate bitumen assets and Paramount's development of its
    shale gas assets; 
--  the anticipated costs and completion date of the two new triple-sized
    walking drilling rigs; 
--  business strategies and objectives; 
--  sources of and plans for funding Paramount's exploration, development,
    facilities and other expenditures; 
--  the extension of the Existing Facility and the outcome of discussions
    regarding an expansion thereof;  
--  acquisition and disposition plans; 
--  regulatory applications and the anticipated scope, timing and results
    thereof; 
--  future taxes payable or owing; and 
--  the outcome and timing of any legal claims, audits, assessments or other
    regulatory matters or proceedings. 

 
Such forward-looking information is based on a number of assumptions
which may prove to be incorrect. The following assumptions have been
made, in addition to any other assumptions identified in this
document: 


 
--  future crude oil, bitumen, natural gas and NGLs prices and general
    economic, business and market conditions; 
--  the ability of Paramount to obtain required capital to finance its
    exploration and development activities and its new and expanded
    facilities; 
--  the ability of Paramount to obtain equipment, services, supplies and
    personnel in a timely manner and at an acceptable cost to carry out its
    activities; 
--  the ability of Paramount to market its oil, natural gas and NGLs
    successfully to current and new customers; 
--  the ability of Paramount to secure adequate product processing,
    transportation and storage; 
--  the ability of Paramount and its industry partners to obtain drilling
    success and production levels consistent with expectations, including
    with respect to anticipated res
erves additions and NGLs yields;  
--  the timely receipt of required regulatory approvals; 
--  expected timelines and budgets being met in respect of facilities
    development and construction projects; 
--  access to capital markets and other sources of funding for Paramount's
    operations and planned expenditures; 
--  anticipated rates of return from existing and planned projects relative
    to other opportunities;  
--  estimates of input and labour costs; and 
--  currency exchange and interest rates. 

 
Although Paramount believes that the expectations reflected in such
forward looking information is reasonable, undue reliance should not
be placed on it as Paramount can give no assurance that such
expectations will prove to be correct. Forward-looking information is
based on current expectations, estimates and projections that involve
a number of risks and uncertainties which could cause actual results
to differ materially from those anticipated by Paramount and
described in the forward looking information. These risks and
uncertainties include, but are not limited to: 


 
--  fluctuations in crude oil, bitumen, natural gas and NGLs prices, foreign
    currency exchange rates and interest rates; 
--  the uncertainty of estimates and projections relating to future revenue,
    future production, NGLs yields, costs and expenses and the timing
    thereof; 
--  the ability to secure adequate product processing, transportation and
    storage; 
--  the uncertainty of exploration, development and drilling activities; 
--  operational risks in exploring for, developing and producing crude oil,
    bitumen, natural gas, and NGLs, and the timing thereof;  
--  the ability to obtain equipment, services, supplies and personnel in a
    timely manner and at an acceptable cost; 
--  potential disruptions or unexpected technical difficulties in designing,
    developing or operating new, expanded or existing facilities including
    third party facilities; 
--  risks and uncertainties related to the geology of oil and gas deposits; 
--  the uncertainty of reserves and resource estimates; 
--  the ability to generate sufficient cash flow from operations and obtain
    other sources of financing at an acceptable cost to fund planned
    exploration, development and operational activities and meet current and
    future obligations, including costs of anticipated new and expanded
    facilities and other projects; 
--  changes to, or in the interpretation of, applicable laws, regulations or
    policies; 
--  changes in environmental laws including emission reduction obligations; 
--  the receipt, timing, and scope of governmental or regulatory approvals; 
--  changes in economic, business and market conditions; 
--  the uncertainty regarding aboriginal claims and co-existing with local
    populations and stakeholders; 
--  the effects of weather; 
--  the timing and cost of future abandonment and reclamation activities; 
--  clean-up costs or business interruptions resulting from environmental
    damage and contamination; 
--  the ability to enter into or continue leases; 
--  existing and potential lawsuits and regulatory actions; 
--  future taxes payable; and  
--  other risks and uncertainties described elsewhere in this document and
    in Paramount's other filings with Canadian securities authorities,
    including its Annual Information Form.  

 
The foregoing list of risks is not exhaustive. Additional information
concerning these and other factors which could impact Paramount are
included in Paramount's most recent Annual Information Form. The
forward-looking information contained in this document is made as of
the date hereof and, except as required by applicable securities law,
Paramount undertakes no obligation to update publicly or revise any
forward-looking statements or information, whether as a result of new
information, future events or otherwise. 
NON-GAAP MEASURES 
In this document "Funds flow from operations", "Funds flow from
operations - per Boe", "Funds flow from operations per share -
diluted", "Netback", "Netback including financial commodity contract
settlements", "Net Debt", "Exploration and development expenditures"
and "Investments in other entities - market value", collectively the
"Non-GAAP measures", are used and do not have any standardized
meanings as prescribed by Generally Accepted Accounting Principles in
Canada ("GAAP").  
Funds flow from operations refers to cash from operating activities
before net changes in operating non-cash working capital, geological
and geophysical expenses and asset retirement obligation settlements.
Funds flow from operations is commonly used in the oil and gas
industry to assist management and investors in measuring the
Company's ability to fund capital programs and meet financial
obligations. Netback equals petroleum and natural gas sales less
royalties, operating costs, production taxes and transportation
costs. Netback is commonly used by management and investors to
compare the results of the Company's oil and gas operations between
periods. Net Debt is a measure of the Company's overall debt position
after adjusting for certain working capital amounts and is used by
management to assess the Company's overall leverage position. Refer
to the calculation of Net Debt in the liquidity and capital resources
section of Management's Discussion and Analysis. Exploration and
development expenditures refer to capital expenditures and geological
and geophysical costs incurred by the Company's COUs (excluding land
and acquisitions). The exploration and development expenditure
measure provides management and investors with information regarding
the Company's Principal Property spending on drilling and
infrastructure projects, separate from land acquisition activity.
Investments in other entities - market value reflects the Company's
investments in enterprises whose securities trade on a public stock
exchange at their period end closing price (e.g. Trilogy, MEG Energy,
MGM Energy and others), and investments in all other entities at book
value. Paramount provides this information because the market values
of equity-accounted investments, which are significant assets of the
Company, are often materially different than their carrying values.  
Non-GAAP measures should not be considered in isolation or construed
as alternatives to their most directly comparable measure calculated
in accordance with GAAP, or other measures of financial performance
calculated in accordance with GAAP. The Non-GAAP measures are
unlikely to be comparable to similar measures presented by other
issuers. 
OIL AND GAS MEASURES AND DEFINITIONS 
This document contains disclosures expressed as "Boe" and "Boe/d".
All oil and natural gas equivalency volumes have been derived using
the ratio of six thousand cubic feet of natural gas to one barrel of
oil. Equivalency measures may be misleading, particularly if used in
isolation. A conversion ratio of six thousand cubic feet of natural
gas to one barrel of oil is based on an energy equivalency conversion
method primarily applicable at the burner tip and does not represent
a value equivalency at the well head. The term "liquids" is used to
represent oil and natural gas liquids.  
During the third quarter of 2012, the value ratio between crude oil
and natural gas was approximately 32:1. This value ratio is
significantly different from the energy equivalency ratio of 6:1.
Using a 6:1 ratio would be misleading as an indication of value. 
TEST RESULTS 
Test rates disclosed in this document represent the average rate of
gas-flow during post clean-up production tests up 4 1/2" casing. All
wells were stimulated using frac oil and substantially all fluids
recovered during the test periods were load fluids. As a result,
recovered fluid volumes for the duration of the tests have not been
disclosed. Pressure transient analyses and well-test interpretations
have not been carried out for the wells disclosed and as such, data
shoul
d be considered to be preliminary until such analysis or
interpretation has been done. Test results are not necessarily
indicative of long-term performance or of ultimate recovery.
Contacts:
Paramount Resources Ltd.
J.H.T. (Jim) Riddell
President and Chief Operating Officer
(403) 290-3600 
Paramount Resources Ltd.
B.K. (Bernie) Lee
Chief Financial Officer
(403) 290-3600
(403) 262-7994 (FAX)
www.paramountres.com