LukOil(OAO) LKOB Start of Production Drilling at West Qurna-2
LukOil(OAO) (LKOB) - Start of Production Drilling at West Qurna-2
RNS Number : 0233C
LukOil (OAO)
25 April 2012
LUKOIL STARTS ACTIVE DEVELOPMENT AT THE WEST QURNA-2 FIELD IN IRAQ
LUKOIL started production drilling and construction of a key production
facility, namely a Central Processing Facility, at the West Qurna-2 field in
Iraq today.
Abdel Karim al-Luaibi, the Iraqi Oil Minister, and also the heads of the Basra
province, Iraq's South Oil Company, LUKOIL Overseas and of the major
contractor companies Baker Hughes and Samsung Engineering all participated in
the festive ceremony dedicated to the occasion.
As part of this drilling project, 23 directional wells will be constructed.
Drilling operations will occur simultaneously at 5 well pads by means of
state-of-the-art diesel electric units with a bearing capacity of 450 tons,
which allows workers to drill wells as deep as 5,000 meters without equipment
remounting. The units are specially modified to be promptly relocated within
the well pads under the cluster slider rig scheme. Later the drilling
operations will be conducted at the other 4 well pads with similar units.
The Central Processing Facility will be constructed along with the facilities
for well pads infrastructure development and oil gathering lines, as well as
the water and power supply systems, shift camp and a number of other
infrastructure and support facilities.
'We have opened the active field development stage today. Upon reaching the
production volume of 150,000 barrels per day LUKOIL will receive the right to
reimburse expenses and receive remuneration. After the initial expenses are
reimbursed, the project will turn into a self-financing entity. The total
investments in the full-scale project implementation will come to around USD
25 billion', Vagit Alekperov, OAO LUKOIL President, said.
The West Qurna-2 field, discovered in 1973 with the help of Soviet geologists,
is the world's second largest undeveloped field with recoverable oil reserves
of around 14 billion barrels. The field, covering an area of 340 square
kilometers, is located in the southern part of Iraq, 65 kilometers to the
north-west of Basra, a major seaport. The Development and Production Agreement
for the West Qurna-2 field was signed on January 31, 2010 for a 20-year period
with the possibility of 5-year extension. The project parties have the
following shares: LUKOIL, 56.25%, Iraq's state-owned North Oil Company, 25%,
and Statoil ASA, 18.75%.
This information is provided by RNS
The company news service from the London Stock Exchange
END
STRKELBLLZFXBBB -0- Apr/25/2012 09:34 GMT
Sponsored Links
Advertisement
Advertisements
Sponsored Links
Advertisement
Rate this Page